2014 Fish Passage Plan - Draft Sections and Change Forms

Production Schedule & Deadlines

Final 2014 Fish Passage Plan

(posted by Feb 28, 2014)

To propose a change to the current 2013 Fish Passage Plan, send a completed FPP Change Form to the Fish Passage Plan Coordinator.
To ensure your proposed changes are captured accurately, please make all edits to existing text in "Track Changes".

Section Draft Change Form Last Update FPOM Review
Section 1 - Overview 14OVE001 - Project Facts & Info 1/23/14 Approved 1/22/14
  14OVE002 - TDG Monitoring 1/23/14 Approved 2/13/14
  14OVE003 - District Planning 1/23/14 Approved 1/22/14
Section 2 - Bonneville Dam 14BON001 - PH2 Mid-Range Operation 5/8/14 Approved 5/8/14
  14BON002 - Slow Roll Operation 5/9/13 Approved 5/9/13
  14BON003 - STS Reinstall Criteria 5/9/13 Approved 5/9/13
  14BON004 - Wicket Gate Position 5/9/13 Approved 5/9/13
  14BON005 - Nav Lock Dewater 1/23/14 Approved 1/22/14
  14BON006 - Facts & Info 2/6/14 Approved 1/22/14
  14BON007 - Hazing Activities 1/23/14 Approved 1/22/14
  14BON008 - Adult Diel Distribution 1/23/14 Approved 1/22/14
  14BON009 - Fish Unit Trash Raking 1/23/14 Approved 1/22/14
  14BON010 - Unit 1 ITS Chain Gates 1/23/14 Approved 1/22/14
  14BON011 - SLEDS Installation 1/23/14 Approved 2/13/14
  14BON012 - Modified Minimum FB 7/3/14 Withdrawn 4/10/14
  14BON013 - PH2 TIEs 2/12/14 Approved 2/13/14
  14BON014 - BOP Definition 2/12/14 Approved 2/13/14
Section 3 - The Dalles Dam 14TDA001 - Wicket Gate Test Time 5/9/13 Approved  5/9/13
  14TDA002 - ROV Trashrack Inspection 7/11/13 Approved 7/11/13
  14TDA003 - Sluicegate Move Timing 7/11/13 Approved 7/11/13
  14TDA004 - Nav Lock Dewater 1/23/14 Approved 1/22/14
  14TDA005 - Facts & Info 2/6/14 Approved 1/22/14
  14TDA006 - Hazing Activities 1/23/14 Approved 1/22/14
  14TDA007 - Synchronize Unit Priority 1/23/14 Approved 1/22/14
  14TDA008 - Adult Diel Distribution 1/23/14 Approved 1/22/14
  14TDA009 - Split Flows 7/3/14 Withdrawn 6/12/14
  14TDA010 - Count Station Picket Leads 1/23/14 Approved 1/22/14
  14TDA011 - ITS 8 & 18 1/23/14 Approved 1/22/14
  14TDA012 - Delete ITS Test 2/5/15 Approved 1/22/14
Section 4 - John Day Dam 14JDA001 - Wicket Gate Test Time 5/9/13 Approved 5/9/13
  14JDA002 - Nav Lock Dewater 1/23/14 Approved 1/22/14
  14JDA003 - TSW Operating Dates 1/23/14 Approved 1/22/14
  14JDA004 - Facts & Info 2/6/14 Approved 1/22/14
  14JDA005 - Hazing Activities 1/23/14 Approved 1/22/14
  14JDA006 - Adult Diel Distribution 1/23/14 Approved 1/22/14
  14JDA007 - Daytime Spill Schedule 1/23/14 Approved 1/22/14
  14JDA008 - North Fishway Entrance Weir 1/23/14 Approved 1/22/14
  14JDA009 - North Ladder AWS 1/23/14 Approved 1/22/14
Section 5 - McNary Dam 14MCN001 - SFE & NFE Sill Elevations 1/27/14 Approved 1/22/14
  14MCN002 - ESBS/VBS Cleaning 2/6/14 Approved 2/13/14
  14MCN003 - Backflush Orifices 2/6/14 Approved 2/13/14
  14MCN004 - Reorganize Warm Water Ops 1/27/14 Approved 1/22/14
  14MCN005 - Facts & Info 2/6/14 Approved 1/22/14
  14MCN006 - Spill Tables TSW Update 1/27/14 Approved 1/22/14
  14MCN007 - Forebay Debris Removal 2/10/14 Approved 2/13/14
  14MCN008 - No Transport 2/6/14 Approved 2/13/14
  14MCN009 - ESBS Inspection 1/27/14 Approved 1/22/14
  14MCN010 - Operating Gates Position 1/28/14 Approved 1/22/14
  14MCN011 - Diel Graphs 1/27/14 Approved 1/22/14
  14MCN012 - Turbine Trash Raking 2/10/14 Approved 2/13/14
Section 6 - Ice Harbor Dam 14IHR001 - Facts & Info 2/6/14 Approved 1/22/14
  14IHR002 - Unit Dewatering 1/27/14 Approved 1/22/14
  14IHR003 - Diel Graphs 1/27/14 Approved 1/22/14
Section 7 - Lower Monumental Dam 14LMN001 - Unit 1 Priority 1/27/14 Approved 5/9/13
  14LMN002 - Diel Graphs 1/27/14 Approved 1/22/14
  14LMN003 - Head Gates 1/27/14 Approved 1/22/14
  14LMN004 - Facts & Info 2/6/14 Approved 1/22/14
Section 8 - Little Goose Dam 14LGS001 - Facts & Info 2/6/14 Approved 1/22/14
  14LGS002 - Spillway Weir Operations 2/6/14 Approved 2/13/14
  14LGS003 - ESBS Inspection 1/27/14 Approved 1/22/14
  14LGS004 - Low Flow Turbine Ops 1/27/14 Approved 1/22/14
  14LGS005 - Diel Graphs 1/27/14 Approved 1/22/14
Section 9 - Lower Granite Dam 14LWG001 - Unit 1 Ops 1/27/14 Approved 1/22/14
  14LWG002 - Gatewell Orifices 1/31/14 Approved 2/13/14
  14LWG003 - ESBS Inspection 1/27/14 Approved 1/22/14
  14LWG004 - Facts & Info 2/6/14 Approved 1/22/14
  14LWG005 - Turbine Maintenance 1/27/14 Approved 1/22/14
  14LWG006 - Diel Graphs 1/27/14 Approved 1/22/14
  14LWG007 - Adult Delay Alternative Operations 6/23/14 Not Approved 6/12/14
Appendix A - Special Operations & Studies -- 2/18/14 --
Appendix B - Transportation Plan 14AppB001 - Delete MCN Transport 2/10/14 Approved 2/13/14
  14AppB002 - Introduction Revision 2/10/14 Approved 2/13/14
  14AppB003 - LMN Collection Start Time 2/10/14 Approved 2/13/14
Appendix C - BPA Load Shaping Guidelines -- 12/31/13 --
Appendix D - Operations for Non-Listed Species 14AppD001 - JDA Lamprey Trap Protocols 1/23/14 Approved 2/13/14
  14AppD002 - NWW Updates 1/23/14 Approved 2/13/14
  14AppD003 - BON, TDA Updates 1/23/14 Approved 2/13/14
Appendix E - Fish Operations Plan (FOP) *Draft review via RIOG* 14AppE001 - Camas-Washougal 2/14/14 Approved 1/22/14
Appendix F - Dewatering Fish Handling Guidelines -- 12/31/13 --
Appendix G - Adult Trap Protocols BON, IHR, LWG 14AppG001 - BON New Observation Tanks 5/13/13 Approved 4/11/13
  14AppG002 - IHR New Trap Protocols 4/26/13 Approved 4/26/13
  14AppG003 - BON AFF Picket Leads 1/23/14 Partially Approved 2/13/14
Appendix H - CHJ Turbine Dewatering -- 12/31/13 --
Appendix I - DWR Turbine Maintenance -- 12/31/13 --
Appendix J - Smolt Facility Protocols BON, JDA, MCN 14AppJ001 - MCN Sampling Protocols 2/18/14 Approved 2/13/14
Appendix K - Acronyms -- 12/31/13 --
 