Final Section | Pdf/Doc | Posted* | ||
Complete Document - Final 2014 Fish Passage Plan (12.5 mb) | 13 June 2014* | |||
Section 1 - Overview | 24 Feb 2014 | |||
Section 2 - Bonneville Dam | 21 May 2014* | |||
Section 3 - The Dalles Dam | 15 Apr 2014* | |||
Section 4 - John Day Dam | 24 Feb 2014 | |||
Section 5 - McNary Dam | 24 Feb 2014 | |||
Section 6 - Ice Harbor Dam | 24 Feb 2014 | |||
Section 7 - Lower Monumental Dam | 24 Feb 2014 | |||
Section 8 - Little Goose Dam | 15 Apr 2014* | |||
Section 9 - Lower Granite Dam | 24 Feb 2014 | |||
Appendix A - Special Project Operations & Studies | 24 Feb 2014 | |||
Appendix B - Corps of Engineeers Juvenile Fish Transportation Plan | 24 Feb 2014 | |||
Appendix C - BPA System Load Shaping Guidelines for Turbine Operations | 24 Feb 2014 | |||
Appendix D - Operations for Non-ESA Listed Fish Species | 24 Feb 2014 | |||
Appendix E - Fish Operations Plan (FOP) | 13 Jun 2014* | |||
Appendix F - Dewatering and Fish Handling (Salvage) Plans | 24 Feb 2014 | |||
Appendix G - Adult Trapping Protocols at BON, IHR, LWG | 24 Feb 2014 | |||
Appendix H - Turbine Dewatering Procedure for Chief Joseph Dam | 24 Feb 2014 | |||
Appendix I - Dworshak Dam Fish Protection for Turbine Maintenance | 24 Feb 2014 | |||
Appendix J - Smolt Facility Protocols at BON, JDA, MCN | 24 Feb 2014 | |||
Appendix K - List of Acronyms | 24 Feb 2014 | |||
Draft 2014 Fish Passage Plan (draft sections showing all changes for 2014) |
||
Fish Passage Plan Homepage |
||