Complete Document | 09-Mar-2012 | |||
2012 Fish Passage Plan (13 mb) |
![]() |
|||
Individual Project Sections | 01-Mar-2012 | |||
Table of Contents |
![]() |
|||
Section 1 - Overview |
![]() ![]() |
|||
Section 2 - Bonneville Dam |
![]() ![]() | |||
Section 3 - The Dalles Dam |
![]() ![]() |
|||
Section 3 UPDATE - Table TDA-6. Spill Pattern. Revised 25-Jul-2012 |
![]() ![]() |
|||
Section 4 - John Day Dam |
![]() ![]() |
|||
Section 5 - McNary Dam |
![]() ![]() | |||
Section 6 - Ice Harbor Dam |
![]() ![]() |
|||
Section 7 - Lower Monumental Dam |
![]() ![]() |
|||
Section 8 - Little Goose Dam |
![]() ![]() |
|||
Section 9 - Lower Granite Dam |
![]() ![]() | |||
Appendices | 01-Mar-2012 | |||
Appendix A - Special Project Operations & Studies |
![]() ![]() |
|||
Appendix B - Corps of Engineeers Juvenile Fish Transportation Plan |
![]() ![]() |
|||
Appendix C - BPA System Load Shaping Guidelines Regarding Turbine Operation & Best Efficiency |
![]() ![]() |
|||
Appendix D - Corps of Engineers Plan of Action for TDG Monitoring 2010-2014 |
![]() |
|||
Appendix E - Fish Operations Plan (FOP) |
![]() |
|||
Appendix F - Guidelines for Dewatering and Fish Handling (Salvage) Plans |
![]() ![]() |
|||
Appendix G - Protocols for Adult Fish Trapping Operations at BON, IHR and LWG |
![]() ![]() |
|||
Appendix H - Turbine Dewatering Procedure for Chief Joseph Dam |
![]() ![]() |
|||
Appendix I - Dworshak Dam Fish Protection Procedures for Turbine Maintenance |
![]() ![]() |
|||
Appendix J - Protocols for Juvenile Monitoring Facility Operations at Bonneville Dam |
![]() ![]() |
|||
Appendix K - Protocols for Smolt Monitoring Facility Operations at John Day Dam |
![]() ![]() |
|||
Appendix L - List of Acronyms Used in the 2012 Fish Passage Plan |
![]() ![]() |
|||
Draft 2012 Fish Passage Plan and Proposed Changes |
||
Fish Passage Plan Homepage |
||