2012 Fish Passage Plan
Draft Sections and Change Forms

DEADLINES

To propose a change to the current Fish Passage Plan, please send a change form ([MS Word] ) or a modified existing change form to the Fish Passage Plan Coordinator.
To ensure your proposed changes are captured accurately, please make all edits to existing text in "Track Changes".

Final 2011 Fish Passage Plan

[PDF] [MS Word] Draft Section 1 Overview  
Change Forms   12OVE001 - Lamprey Passage  Approved 08-Dec-2011
[PDF] [MS Word] Draft Section 2 Bonneville Dam  
Change Forms   12BON001 - PH2 Reduced Nightime Flow  Approved 14-Apr-2011
  12BON002 - Spill Operation Relocated to Appendix E  Approved 14-Jul-2011
  12BON003 - Slow Roll Extended to Year-Round  Approved 20-Jan-2012
  12BON004 - ITS Winter Operations  Approved 20-Jan-2012
  12BON005 - Split Flows Jack Counts  Approved 20-Jan-2012
  12BON006 - Count Window Cleaning  Approved 20-Jan-2012
  12BON007 - Table BON-3 Adult Counting  Approved 20-Jan-2012
  12BON008 - B2CC Gate Hoist Operations  Approved 20-Jan-2012
  12BON009 - VBS Re-installation Criteria  Approved 09-Feb-2012
  12BON010 - B2CC Kelt Operation  Denied 08-Mar-2012
  12BON011 - Table BON-14 Unit Priority for Kelt Operation  Denied 08-Mar-2012
[PDF] [MS Word] Draft Section 3 The Dalles Dam  
Change Forms  12TDA001 - Spill Patterns Clarification  Approved 09-Jun-2011
  12TDA002 - Count Window Crowder  Approved 01-Nov-2011
  12TDA003 - Table TDA-4 Unit Priority  Approved 20-Jan-2012
  12TDA004 - Instrument Cleaning  Approved 20-Jan-2012
[PDF] [MS Word] Draft Section 4 John Day Dam  
Change Forms  12JDA001 - PDS Dewatering  Approved 01-Nov-2011
  12JDA002 - Spill Operation Relocated to Appendix E  Denied 20-Jan-2012
  12JDA003 - Instrument Cleaning  Approved 20-Jan-2012
[PDF] [MS Word] Draft Section 5 McNary Dam  
Change Forms  12MCN001 - TSW Removal  Approved 14-Apr-2011
  12MCN002 - Forebay Debris Removal  Approved 20-Jan-2012
  12MCN003 - Winter Emergency Bypass Procedures  Approved 20-Jan-2012
  12MCN004 - ESBS Cold Weather Operations  Denied 20-Jan-2012
  12MCN005 - Turbine Unit Priority  Approved 20-Jan-2012
  12MCN006 - Winter Trash Rack Maintenance  Approved 20-Jan-2012
  12MCN007 - Emergency Debris Spill - Spillway Weir  Approved 20-Jan-2012
  12MCN008 - North Shore Adult Fishway Entrance Operation  Approved 08-Mar-2012
[PDF] [MS Word] Draft Section 6 Ice Harbor Dam  
Change Forms  12IHR001 - Unit Operating Priority  Approved 09-Jun-2011
  12IHR002 - South Shore Auxiliary Water Supply  Approved 20-Jan-2012
  12IHR003 - Emergency Debris Spill RSW  Approved 20-Jan-2012
  12IHR004 - Unit 6 Priority  Denied 20-Jan-2012
[PDF] [MS Word] Draft Section 7 Lower Monumental Dam  
Change Forms  12LMN001 - Spill Operations Relocated to Appendix E  Approved 14-Jul-2011
  12LMN002 - Correct Spill Tables  Approved 20-Jan-2012
  12LMN003 - Navigation (Revised 11LMN003)  Denied 20-Jan-2012
  12LMN004 - RSW O&M Procedures  Approved 20-Jan-2012
  12LMN005 - Unit Priority  Approved 20-Jan-2012
  12LMN006 - Emergency Debris Spill RSW  Approved 20-Jan-2012
  12LMN007 - Spill Pattern Change  Denied 09-Feb-2012
[PDF] [MS Word] Draft Section 8 Little Goose Dam  
Change Forms  12LGS001 - ESBS VBS Inspection Guidelines  Approved 20-Jan-2012
  12LGS002 - Spill Operations Relocated to Appendix E  Approved 14-Jul-2011
  12LGS003 - Flowmeter  Approved 20-Jan-2012
  12LGS004 - ESBS Cold Weather Operations  Approved 20-Jan-2012
  12LGS005 - Table 5 Unit Priority Footnote  Approved 20-Jan-2012
  12LGS006 - Emergency Debris Spill - Spillway Weir  Approved 20-Jan-2012
  12LGS007 - Tunnel Lights  Denied 20-Jan-2012
[PDF] [MS Word] Draft Section 9 Lower Granite Dam  
Change Forms  12LWG001 - Spill Operations Relocated to Appendix E  Approved 14-Jul-2011
  12LWG002 - Emergency Debris Spill RSW  Approved 20-Jan-2012
  12LWG003 - Navigation (Revised 11LWG001)  Denied 20-Jan-2012
  12LWG004 - Tunnel Lights  Approved 20-Jan-2012
  12LWG005 - Adult Ladder Weirgate Test  Approved 09-Feb-2012
  12LWG006 - Table LWG-5 Unit Priority  Approved 08-Mar-12
[PDF] [MS Word] Draft Appendix A Special Project Operations and Studies  
[PDF] [MS Word] Draft Appendix B Corps of Engineeers Juvenile Fish Transportation Plan  
Change Forms  12AppB001 Transport Minimum Number  Withdrawn 06-Feb-2012
[PDF] Appendix C BPA System Load Shaping Guidelines Regarding Turbine Operation & Best Efficiency  
[PDF] Appendix D Corps of Engineers Plan of Action for TDG Monitoring, 2010-2014  
(n/a) Appendix E Fish Operations Plan (FOP)  
[PDF] [MS Word] Draft Appendix F Guidelines for Dewatering and Fish Handling Plans  
[PDF] [MS Word] Draft Appendix G Protocols for Adult Fish Trapping Operations at BON, IHR and LWG  
Change Forms  12AppG - BON AFF fish over 100cm  Approved 20-Jan-2012
[PDF] Appendix H Turbine Dewatering Procedure for Chief Joseph Dam (Aug. 13, 2002)  
[PDF] [MS Word] Draft Appendix I Dworshak Fish Protection Procedures for Turbine Maintenance  
Change Forms  12AppI001 - DWR Fish Protection Measures - Change Justifications  Approved 27-Feb-2012
[PDF] [MS Word] Draft Appendix J Protocols for Juvenile Monitoring Facility Operations at Bonneville Dam  
[PDF] [MS Word] Draft Appendix K Protocols for Smolt Monitoring Facility Operations at John Day Dam  
[PDF] [MS Word] Draft Appendix L List of Acronyms  

Final 2012 Fish Passage Plan