Complete Document | ||
Final 2011 Fish Passage Plan | ![]() |
|
Individual Plan Sections | ||
Table of Contents |
![]() ![]() |
|
1.0 | Overview |
![]() ![]() |
2.0 | Bonneville |
![]() ![]() |
12BON001 Spill Operations Relocated to Appendix E | ||
BON Special Spill Pattern - Dec. 29, 2011 | ||
BON Special Spill Pattern - Jan. 19, 2012 | ||
3.0 | The Dalles |
![]() ![]() |
*Table TDA 6 has been revised. The revised table can be found at: TDA 6. Spill Pattern Revised April 20, 2011 |
||
4.0 | John Day |
![]() ![]() |
*Table JDA 10 was not included in the 2011 FPP. Table JDA 10 taken from the 2010 FPP is included below: JDA 10. Spill Pattern without TSWs |
||
5.0 | McNary |
![]() ![]() |
6.0 | Ice Harbor |
![]() ![]() |
*Table IHR-12 has been revised. The revised table can be found at: Table IHR-12 Ice Harbor RSW 30% Spill Pattern (Revised 5/17/11) |
||
7.0 | Lower Monumental |
![]() ![]() |
*Table LMN-12 has been revised. The revised table can be found at: Table LMN-12 Bulk Spill Pattern |
||
*Table LMN-13 has been revised. The revised table can be found at: Table LMN-13 Uniform Spill Pattern |
||
12LMN001 Spill Operations Relocated to Appendix E | ||
8.0 | Little Goose |
![]() ![]() |
12LGS002 Spill Operations Relocated to Appendix E | ||
9.0 | Lower Granite |
![]() ![]() |
12LWG001 Spill Operations Relocated to Appendix E | ||
Appendices | ||
10.0 | A. Special Project Operations and Studies Bonneville |
![]() ![]() |
*The COE revised 2.2 Adult Kelt Passage at B1 Sluiceway and B2CC. The revision may be found at: 2.2 Adult Kelt Passage |
||
11.0 | A. Special Project Operations and Studies The Dalles |
![]() ![]() |
12.0 | A. Special Project Operations and Studies John Day |
![]() ![]() |
13.0 | A. Special Project Operations and Studies McNary |
![]() ![]() |
14.0 | A. Special Project Operations and Studies Ice Harbor |
![]() ![]() |
15.0 | A. Special Project Operations and Studies Lower Monumental |
![]() ![]() |
16.0 | A. Special Project Operations and Studies Little Goose |
![]() ![]() |
17.0 | A. Special Project Operations and Studies Lower Granite |
![]() ![]() |
18.0 | B. Corps of Engineeers Juvenile Fish Transportation Plan |
![]() ![]() |
19.0 | C. BPA's System Load Shaping Guidelines Regarding Turbine Operation and Best Efficiency |
![]() ![]() |
20.0 | D. Corps of Engineers Plan of Action for Dissolved Gas Monitoring |
![]() |
21.0 | E. Fish Operations Plan (FOP) |
![]() |
22.0 | F. Guidelines for Dewatering and Fish Handling (Salvage) Plans |
![]() ![]() |
23.0 | G. Protocols for Adult Fish Trapping Operations at Bonneville, Ice Harbor and Lower Granite Dams |
![]() ![]() |
24.0 | H. Turbine Dewatering Procedure for Chief Joseph Dam |
![]() ![]() |
25.0 | I. Dworshak Fish Protection Procedures for Turbine Maintenance |
![]() ![]() |
26.0 | J. Protocols for Juvenile Monitoring Facility Operations at Bonneville Dam |
![]() ![]() |
27.0 | K. Protocols for Smolt Monitoring Facility Operations at John Day Dam |
![]() ![]() |
28.0 | L. List of Acronyms |
![]() ![]() |
Final 2010 Fish Passage Plan | ||
Draft 2011 Fish Passage Plan | ||
Change Forms for the 2011 Fish Passage Plan. To propose a change, please send a change form or a modified existing change to the Fish Passage Plan Coordinator. |
![]() ![]() |
|