Final 2011 Fish Passage Plan

March 10, 2011

**Spill tables are only available in the PDF files of the individual plan sections**
 
Complete Document  
  Final 2011 Fish Passage Plan [PDF]
 
Individual Plan Sections  
Table of Contents [Word] / [PDF]
1.0 Overview [Word] / [PDF]
2.0 Bonneville [Word] / [PDF]
12BON001 Spill Operations Relocated to Appendix E
BON Special Spill Pattern - Dec. 29, 2011
BON Special Spill Pattern - Jan. 19, 2012
3.0 The Dalles [Word] / [PDF]
*Table TDA 6 has been revised. The revised table can be found at:
TDA 6. Spill Pattern Revised April 20, 2011
4.0 John Day [Word] / [PDF]
*Table JDA 10 was not included in the 2011 FPP. Table JDA 10 taken from the 2010 FPP is included below:
JDA 10. Spill Pattern without TSWs
5.0 McNary [Word] / [PDF]
6.0 Ice Harbor [Word] / [PDF]
*Table IHR-12 has been revised. The revised table can be found at:
Table IHR-12 Ice Harbor RSW 30% Spill Pattern (Revised 5/17/11)
7.0 Lower Monumental [Word] / [PDF]
*Table LMN-12 has been revised. The revised table can be found at:
Table LMN-12 Bulk Spill Pattern
*Table LMN-13 has been revised. The revised table can be found at:
Table LMN-13 Uniform Spill Pattern
12LMN001 Spill Operations Relocated to Appendix E
8.0 Little Goose [Word] / [PDF]
12LGS002 Spill Operations Relocated to Appendix E
9.0 Lower Granite [Word] / [PDF]
12LWG001 Spill Operations Relocated to Appendix E
Appendices  
10.0 A. Special Project Operations and Studies Bonneville [Word] / [PDF]
*The COE revised 2.2 Adult Kelt Passage at B1 Sluiceway and B2CC. The revision may be found at:
2.2 Adult Kelt Passage
11.0 A. Special Project Operations and Studies The Dalles [Word] / [PDF]
12.0 A. Special Project Operations and Studies John Day [Word] / [PDF]
13.0 A. Special Project Operations and Studies McNary [Word] / [PDF]
14.0 A. Special Project Operations and Studies Ice Harbor [Word] / [PDF]
15.0 A. Special Project Operations and Studies Lower Monumental [Word] / [PDF]
16.0 A. Special Project Operations and Studies Little Goose [Word] / [PDF]
17.0 A. Special Project Operations and Studies Lower Granite [Word] / [PDF]
18.0 B. Corps of Engineeers Juvenile Fish Transportation Plan [Word] / [PDF]
19.0 C. BPA's System Load Shaping Guidelines Regarding Turbine Operation and Best Efficiency [Word] / [PDF]
20.0 D. Corps of Engineers Plan of Action for Dissolved Gas Monitoring [PDF]
21.0 E. Fish Operations Plan (FOP) [PDF]
22.0 F. Guidelines for Dewatering and Fish Handling (Salvage) Plans [Word] / [PDF]
23.0 G. Protocols for Adult Fish Trapping Operations at Bonneville, Ice Harbor and Lower Granite Dams [Word] / [PDF]
24.0 H. Turbine Dewatering Procedure for Chief Joseph Dam [Word] / [PDF]
25.0 I. Dworshak Fish Protection Procedures for Turbine Maintenance [Word] / [PDF]
26.0 J. Protocols for Juvenile Monitoring Facility Operations at Bonneville Dam [Word] / [PDF]
27.0 K. Protocols for Smolt Monitoring Facility Operations at John Day Dam [Word] / [PDF]
28.0 L. List of Acronyms [Word] / [PDF]
 
  Final 2010 Fish Passage Plan  
 
  Draft 2011 Fish Passage Plan  
 
Change Forms for the 2011 Fish Passage Plan. To propose a change, please send
a change form or a modified existing change to the Fish Passage Plan Coordinator.
[Word] / [PDF]