Final 2010 Fish Passage Plan

March 11, 2010

Complete Document  
  Final 2010 Fish Passage Plan [PDF]
 
Individual Plan Sections  
1.0 Table of Contents [Word] / [PDF]
1.1 Overview [Word] / [PDF]
2.0 Bonneville [Word] / [PDF]
3.0 The Dalles [Word] / [PDF]
*Table TDA-6 has been revised. The revised table can be found at:
10TDA 005 Table TDA 6 Revision - Approved
4.0 John Day [Word] / [PDF]
5.0 McNary [Word] / [PDF]
Table MCN-11 McNary Dam Spill Pattern During TSW Removal
6.0 Ice Harbor [Word] / [PDF]
Table IHR-13 Ice Harbor RSW 45kcfs/Spill Cap Spill Pattern
7.0 Lower Monumental [Word] / [PDF]
*Table LMN-5 has been revised. The revised table can be found at:
10LMN 001 LMN Turbine Priority Clarification 3 - Approved
8.0 Little Goose [Word] / [PDF]
*Tables LGS 11, 12, & 13 have been revised. The new tables can be found at:
11LGS 001 LGS SW Operations - Approved
9.0 Lower Granite [Word] / [PDF]
 
Appendices  
10.0 A. Special Project Operations and Studies Bonneville [Word] / [PDF]
11.0 A. Special Project Operations and Studies The Dalles [Word] / [PDF]
12.0 A. Special Project Operations and Studies John Day [PDF]
13.0 A. Special Project Operations and Studies McNary [Word] / [PDF]
14.0 A. Special Project Operations and Studies Ice Harbor [Word] / [PDF]
15.0 A. Special Project Operations and Studies Lower Monumental [Word] / [PDF]
16.0 A. Special Project Operations and Studies Little Goose [Word] / [PDF]
17.0 A. Special Project Operations and Studies Lower Granite [Word] / [PDF]
18.0 B. Corps of Engineeers Juvenile Fish Transportation Plan [Word] / [PDF]
19.0 C. BPA's System Load Shaping Guidelines Regarding Turbine Operation and Best Efficiency [Word] / [PDF]
20.0 D. Corps of Engineers Plan of Action for Dissolved Gas Monitoring in 2010 [PDF]
21.0 E. Fish Operations Plan (FOP) [PDF]
22.0 F. Guidelines for Dewatering and Fish Handling (Salvage) Plans [Word] / [PDF]
23.0 G. Protocols for Adult Fish Trapping Operations at Bonneville, Ice Harbor and Lower Granite Dams
*Appendix G has been revised. The revision can be found at:
Appendix G Revised May 19, 2010 - Approved
24.0 H. Turbine Dewatering Procedure for Chief Joseph Dam [Word] / [PDF]
25.0 I. List of Acronyms [Word] / [PDF]
26.0 J. Protocols for Juvenile Monitoring Facility Operations at Bonneville Dam [Word] / [PDF]
27.0 K. Protocols for Smolt Monitoring Facility Operations at John Day Dam [Word] / [PDF]
 
  Draft 2010 Fish Passage Plan  
 
  Final 2009 Fish Passage Plan  
 
Change Forms for the 2010 Fish Passage Plan. To propose a change, please send
a change form or a modified existing change to the Fish Passage Plan Coordinator.
[Word] / [PDF]
 
  Draft 2011 Fish Passage Plan