Draft 2016 Fish Passage Plan (FPP)
& Change Forms

Final 2016 Fish Passage Plan

* Change forms approved after Feb 22, 2016, are not included in the printed version of the 2016 FPP.
Draft Project-Specific Chapters
(all approved Change Forms in track changes)
Change Forms Posted* FPOM Status
1 - Overview none    
2 - Bonneville Dam 16BON001 - Spill Values to Tenths Dec 17, 2015  APPROVED
  16BON002 - PH2 Mid-Range Operations Jan 29, 2016  APPROVED
  16BON003 - PH2 Lower 1% Operations Jan 29, 2016  APPROVED
3 - The Dalles Dam 16TDA001 - Ladder Crowding Jan 29, 2016  APPROVED
  16TDA002 - Trashracks Dec 17, 2015  APPROVED
  16TDA003 - Water Temperatures Dec 17, 2015  APPROVED
  16TDA004 - Entrance Criteria Dec 17, 2015  APPROVED
  16TDA005 - Reporting Dec 17, 2015  APPROVED
  16TDA006 - PUD Trashraking Jan 29, 2016  Withdrawn
4 - John Day Dam 16JDA001 - SFL AWS Turbine Operation Mar 10, 2016  Withdrawn
5 - McNary Dam 16MCN001 - Figure MCN-1 Open FOGs Dec 17, 2015  APPROVED
6 - Ice Harbor Dam 16IHR001 - Doble Testing Jan 29, 2016  APPROVED
  16IHR002 - Winter Unit Priority Jan 29, 2016  APPROVED
  16IHR003 - Min Gen Standardized Language Jan 29, 2016  APPROVED
  16IHR004 - Cold Weather Standardized Language Jan 29, 2016  APPROVED
  16IHR005 - Low Flow Spill Patterns Jan 29, 2016  APPROVED
  16IHR006 - Condition Sampling Jan 29, 2016  APPROVED
7 - Lower Monumental Dam 16LMN001 - Doble Testing Jan 29, 2016  Withdrawn
  16LMN002 - Min Gen Standardized Language Jan 29, 2016  APPROVED
  16LMN003 - Cold Weather Standardized Language Jan 29, 2016  APPROVED
  16LMN004 - Low Flow Spill Patterns Jan 29, 2016  APPROVED
8 - Little Goose Dam 16LGS001 - Min Gen Standardized Language Jan 29, 2016  APPROVED
  16LGS002 - Cold Weather Standardized Language Jan 29, 2016  APPROVED
  16LGS003 - SW Close Criteria 50kcfs Feb 23, 2016  Withdrawn
9 - Lower Granite Dam 16LWG001 - Gatewell Orifices Jan 29, 2016  APPROVED
  16LWG002 - Min Gen Standardized Language Jan 29, 2016  APPROVED
  16LWG003 - Doble Testing Jan 29, 2016  APPROVED
  16LWG004 - Cold Weather Standardized Language Jan 29, 2016  APPROVED
  16LWG005 - Low Flow Spill Patterns Jan 29, 2016  APPROVED
  16LWG006 - Delete Outdated Language Jan 29, 2016  APPROVED
Draft Appendices
(all edits in Track Changes)
Change Forms Posted* FPOM Status
Appendix A - Special Ops & Studies 16AppA001 - Doble Testing Schedule Feb 16, 2016  APPROVED
Appendix B - Transportation Plan 16AppB001 - Miscellaneous Changes Jan 29, 2016  APPROVED
  16AppB002 - LMN, LGS Condition Sampling * Mar 10, 2016 *  APPROVED
Appendix C - BPA Load Shaping Guidelines none    
Appendix D - Ops for Non-Listed Species none    
Appendix E - Fish Operations Plan (FOP) Comments via RIOG    
Appendix F - Dewatering Fish Salvage none    
Appendix G - Adult Trap Ops BON, IHR, LWG 16AppG001 - Lamprey Collection Temperature Jan 29, 2016  APPROVED
Appendix H - CHJ Turbine Dewatering none    
Appendix I - DWR Turbine Maintenance none    
Appendix J - Smolt Facility Ops BON, JDA, MCN 16AppJ001 - MCN Temperatures Jan 29, 2016  APPROVED
Appendix K - Acronyms none    
Appendix L - Avian Plans none    
 