Draft 2024 Fish Passage Plan (FPP)
& Change Forms

* Change Forms FINALIZED after March 1, 2024, are NOT included in the print version of the 2024 FPP.
Draft Chapters Change Forms Date
Posted
Change Form
Status
Draft Chapter 1 - Overview
Draft Chapter 2 - Bonneville Dam 24BON001 - B-Branch Diffuser Operating Ranges 11-JUL-2024 FINALIZED
24BON002 - B-Branch Entrance Gates 14-NOV-2024 FINALIZED
Draft Chapter 3 - The Dalles Dam
Draft Chapter 4 - John Day Dam 24JDA001 - Surface Spill 2-FEB-2024 FINALIZED
24JDA002 - Spillbay 2 2-FEB-2024 FINALIZED
24JDA003 - NFL Picketed Leads 2-FEB-2024 FINALIZED
24JDA004 - Add SMF Dewatering Section 2-FEB-2024 FINALIZED
24JDA005 - Winter Maintenance Dates 2-FEB-2024 FINALIZED
24JDA006 - Adult Fish Collections Systems 2-FEB-2024 FINALIZED
Draft Chapter 5 - McNary Dam 24MCN001 - Surface Spill 2-FEB-2024 FINALIZED
24MCN002 - TSWs Through Summer
          [Attachment 1]     [Attachment 2]
2-FEB-2024 FINALIZED
24MCN003 - New Spill Patterns 17-APR-2024 UPDATED
24MCN004 - Turbine Range Updates 11-APR-2024 FINALIZED
24MCN005 - Ladder Temperature Monitor Locations 8-AUG-2024 FINALIZED
Draft Chapter 6 - Ice Harbor Dam 24IHR001 - Surface Spill 2-FEB-2024 FINALIZED
24IHR002 - Facility Inspections 2-FEB-2024 FINALIZED
24IHR003 - Collection Channel Orifices 2-FEB-2024 FINALIZED
24IHR004 - Names of Ladder Entrances 2-FEB-2024 FINALIZED
24IHR005 - Emergency Unwatering 2-FEB-2024 FINALIZED
24IHR006 - Fish Counting Slots 2-FEB-2024 FINALIZED
24IHR007 - Max Temperature for Condition Monitoring 2-FEB-2024 FINALIZED
24IHR008 - PIT-tag System Maintenance 2-FEB-2024 FINALIZED
24IHR009 - Unit Outages During High Flows 2-FEB-2024 FINALIZED
24IHR010 - Unwatering Units 2-FEB-2024 FINALIZED
24IHR011 - Warehouse Flooding During High Flows 2-FEB-2024 FINALIZED
24IHR012 - Ladder Temperature Monitor Locations 8-AUG-2024 FINALIZED
Draft Chapter 7 - Lower Monumental Dam 24LMN001 - Surface Spill 2-FEB-2024 FINALIZED
24LMN002 - Ladder Temperature Monitor Locations 8-AUG-2024 FINALIZED
24LMN003 - Unit 5 Fixed-Blade 14-NOV-2024 FINALIZED
Draft Chapter 8 - Little Goose Dam 24LGS001 - Surface Spill 2-FEB-2024 FINALIZED
24LGS002 - LGS Cooling Pump 2-FEB-2024 WITHDRAWN
24LGS003 - Governor Oil Balancing 2-FEB-2024 FINALIZED
24LGS004 - Ladder Temperature Monitor Locations 8-AUG-2024 FINALIZED
Draft Chapter 9 - Lower Granite Dam 24LWG001 - Surface Spill 2-FEB-2024 FINALIZED
24LWG002 - Alternative Spill Patterns 2-FEB-2024 FINALIZED
24LWG003 - Ladder Temperature Monitor Locations 8-AUG-2024 FINALIZED
Draft Appendices
Change Forms Date
Posted
Change Form
Status
Draft Appendix A - Special Ops & Studies 24AppA001 - Doble Schedule 2-FEB-2024 FINALIZED
Draft Appendix B - Transport Plan
Draft Appendix C - BPA Load Shaping Guidelines
Draft Appendix D - Ops for Non-Listed Species
Draft Appendix E - Fish Operations Plan (FOP) N/A (coordinated via RIOG) ------ ------
Draft Appendix F - Dewatering Fish Salvage 24AppF001 -Non-native Fish Handling 14-MAR-2024 FINALIZED
Draft Appendix G - Adult Trap Ops
Draft Appendix H - CHJ Turbine Dewatering
Draft Appendix I - DWR Turbine Maintenance
Draft Appendix J - Smolt Facility Protocols
Draft Appendix K - Acronyms
Draft Appendix L - Predator Mgmt Plans 24AppL001 - Predator Mgmt Updates 7-FEB-2024 FINALIZED
 
Fish Passage Plan Homepage