Draft 2024 Fish Passage Plan (FPP)
& Change Forms
* Change Forms FINALIZED after March 1, 2024, are NOT included in the print version of the 2024 FPP.
Draft Chapters
Change Forms
Date
Posted
Change Form
Status
Draft Chapter 1 - Overview
Draft Chapter 2 - Bonneville Dam
24BON001 - B-Branch Diffuser Operating Ranges
11-JUL-2024
FINALIZED
24BON002 - B-Branch Entrance Gates
14-NOV-2024
FINALIZED
Draft Chapter 3 - The Dalles Dam
Draft Chapter 4 - John Day Dam
24JDA001 - Surface Spill
2-FEB-2024
FINALIZED
24JDA002 - Spillbay 2
2-FEB-2024
FINALIZED
24JDA003 - NFL Picketed Leads
2-FEB-2024
FINALIZED
24JDA004 - Add SMF Dewatering Section
2-FEB-2024
FINALIZED
24JDA005 - Winter Maintenance Dates
2-FEB-2024
FINALIZED
24JDA006 - Adult Fish Collections Systems
2-FEB-2024
FINALIZED
Draft Chapter 5 - McNary Dam
24MCN001 - Surface Spill
2-FEB-2024
FINALIZED
24MCN002 - TSWs Through Summer
[Attachment 1]
[Attachment 2]
2-FEB-2024
FINALIZED
24MCN003 - New Spill Patterns
17-APR-2024
UPDATED
24MCN004 - Turbine Range Updates
11-APR-2024
FINALIZED
24MCN005 - Ladder Temperature Monitor Locations
8-AUG-2024
FINALIZED
Draft Chapter 6 - Ice Harbor Dam
24IHR001 - Surface Spill
2-FEB-2024
FINALIZED
24IHR002 - Facility Inspections
2-FEB-2024
FINALIZED
24IHR003 - Collection Channel Orifices
2-FEB-2024
FINALIZED
24IHR004 - Names of Ladder Entrances
2-FEB-2024
FINALIZED
24IHR005 - Emergency Unwatering
2-FEB-2024
FINALIZED
24IHR006 - Fish Counting Slots
2-FEB-2024
FINALIZED
24IHR007 - Max Temperature for Condition Monitoring
2-FEB-2024
FINALIZED
24IHR008 - PIT-tag System Maintenance
2-FEB-2024
FINALIZED
24IHR009 - Unit Outages During High Flows
2-FEB-2024
FINALIZED
24IHR010 - Unwatering Units
2-FEB-2024
FINALIZED
24IHR011 - Warehouse Flooding During High Flows
2-FEB-2024
FINALIZED
24IHR012 - Ladder Temperature Monitor Locations
8-AUG-2024
FINALIZED
Draft Chapter 7 - Lower Monumental Dam
24LMN001 - Surface Spill
2-FEB-2024
FINALIZED
24LMN002 - Ladder Temperature Monitor Locations
8-AUG-2024
FINALIZED
24LMN003 - Unit 5 Fixed-Blade
14-NOV-2024
FINALIZED
Draft Chapter 8 - Little Goose Dam
24LGS001 - Surface Spill
2-FEB-2024
FINALIZED
24LGS002 - LGS Cooling Pump
2-FEB-2024
WITHDRAWN
24LGS003 - Governor Oil Balancing
2-FEB-2024
FINALIZED
24LGS004 - Ladder Temperature Monitor Locations
8-AUG-2024
FINALIZED
Draft Chapter 9 - Lower Granite Dam
24LWG001 - Surface Spill
2-FEB-2024
FINALIZED
24LWG002 - Alternative Spill Patterns
2-FEB-2024
FINALIZED
24LWG003 - Ladder Temperature Monitor Locations
8-AUG-2024
FINALIZED
Draft Appendices
Change Forms
Date
Posted
Change Form
Status
Draft Appendix A - Special Ops & Studies
24AppA001 - Doble Schedule
2-FEB-2024
FINALIZED
Draft Appendix B - Transport Plan
Draft Appendix C - BPA Load Shaping Guidelines
Draft Appendix D - Ops for Non-Listed Species
Draft Appendix E - Fish Operations Plan (FOP)
N/A (coordinated via RIOG)
------
------
Draft Appendix F - Dewatering Fish Salvage
24AppF001 -Non-native Fish Handling
14-MAR-2024
FINALIZED
Draft Appendix G - Adult Trap Ops
Draft Appendix H - CHJ Turbine Dewatering
Draft Appendix I - DWR Turbine Maintenance
Draft Appendix J - Smolt Facility Protocols
Draft Appendix K - Acronyms
Draft Appendix L - Predator Mgmt Plans
24AppL001 - Predator Mgmt Updates
7-FEB-2024
FINALIZED
Fish Passage Plan Homepage