Draft 2023 Fish Passage Plan (FPP)
& Change Forms
* Change Forms FINALIZED after March 1, 2023, are NOT included in the print version of the 2023 FPP.
Draft Chapters
Change Forms
Date
Posted
Change Form
Status
Draft Chapter 1 - Overview
Draft Chapter 2 - Bonneville Dam
23BON001 - B2FGE Updates
3-FEB-2023
FINALIZED
23BON002 - B2CC Kelt Trigger
3-FEB-2023
FINALIZED
Draft Chapter 3 - The Dalles Dam
Draft Chapter 4 - John Day Dam
23JDA001 - Spillway Inspections
9-FEB-2023
FINALIZED
23JDA002 - Ladder Dewatering
9-FEB-2023
FINALIZED
23JDA003 - U13 Operating Range
9-NOV-2023
FINALIZED
Draft Chapter 5 - McNary Dam
23MCN001 - Macro/Micro Spill Ops
7-MAR-2023
FINALIZED
23MCN002 - Adult Steelhead Spill 2023
8-FEB-2023
FINALIZED
23MCN003 - Summer Spill Patterns
11-MAY-2023
WITHDRAWN
23MCN004 - Fall Surface Spill
30-AUG-2023
FINALIZED
Draft Chapter 6 - Ice Harbor Dam
23IHR001 - Unit 3 Range
3-FEB-2023
FINALIZED
23IHR002 - Adult Steelhead Spill 2023
8-FEB-2023
FINALIZED
23IHR003 - Monthly STS Inspections
3-FEB-2023
FINALIZED
23IHR004 - Single Unit Operation
7-FEB-2023
WITHDRAWN
23IHR005 - South Shore Facility
3-FEB-2023
FINALIZED
23IHR006 - Fall Surface Spill
30-AUG-2023
FINALIZED
Draft Chapter 7 - Lower Monumental Dam
23LMN001 - Early JBS Start
18-JAN-2023
FINALIZED
23LMN002 - Adult Steelhead Spill 2023
8-FEB-2023
FINALIZED
23LMN003 - Gatewell Drawdowns
9-FEB-2023
FINALIZED
23LMN004 - STS Inspections
6-FEB-2023
FINALIZED
23LMN005 - Unit 5 Priority
3-FEB-2023
FINALIZED
23LMN006 - Fall Surface Spill
30-AUG-2023
FINALIZED
Draft Chapter 8 - Little Goose Dam
23LGS001 - Early JBS Start
18-JAN-2023
FINALIZED
23LGS002 - Adult Steelhead Spill 2023
8-FEB-2023
FINALIZED
23LGS003 - Fall Surface Spill
30-AUG-2023
FINALIZED
Draft Chapter 9 - Lower Granite Dam
23LWG001 - Adult Steelhead Spill 2023
8-FEB-2023
FINALIZED
23LWG002 - Fall Surface Spill
30-AUG-2023
FINALIZED
Draft Appendices
Change Forms
Date
Posted
Change Form
Status
Draft Appendix A - Special Ops & Studies
23AppA001 - Doble Schedule
17-FEB-2023
FINALIZED
Draft Appendix B - Transport Plan
23AppB001 - No LMN Summer
3-FEB-2023
FINALIZED
Draft Appendix C - BPA Load Shaping Guidelines
Draft Appendix D - Ops for Non-Listed Species
Draft Appendix E - Fish Operations Plan (FOP)
N/A (coordinated via RIOG)
------
------
Draft Appendix F - Dewatering Fish Salvage
Draft Appendix G - Adult Trap Ops
Draft Appendix H - CHJ Turbine Dewatering
Draft Appendix I - DWR Turbine Maintenance
23AppI001 - DWR Turbine Test Sequence
9-FEB-2023
FINALIZED
Draft Appendix J - Smolt Facility Protocols
23AppJ001 - LMN LGS JBS Start
FINALIZED
Draft Appendix K - Acronyms
Draft Appendix L - Predator Mgmt Plans
23AppL001 - NWW Updates
3-FEB-2023
FINALIZED
23AppL002 - Pinniped Monitoring
11-MAY-2023
FINALIZED
Fish Passage Plan Homepage