Draft 2023 Fish Passage Plan (FPP)
& Change Forms

* Change Forms FINALIZED after March 1, 2023, are NOT included in the print version of the 2023 FPP.
Draft Chapters Change Forms Date
Posted
Change Form
Status
Draft Chapter 1 - Overview
Draft Chapter 2 - Bonneville Dam 23BON001 - B2FGE Updates 3-FEB-2023 FINALIZED
23BON002 - B2CC Kelt Trigger 3-FEB-2023 FINALIZED
Draft Chapter 3 - The Dalles Dam
Draft Chapter 4 - John Day Dam 23JDA001 - Spillway Inspections 9-FEB-2023 FINALIZED
23JDA002 - Ladder Dewatering 9-FEB-2023 FINALIZED
23JDA003 - U13 Operating Range 9-NOV-2023 FINALIZED
Draft Chapter 5 - McNary Dam 23MCN001 - Macro/Micro Spill Ops 7-MAR-2023 FINALIZED
23MCN002 - Adult Steelhead Spill 2023 8-FEB-2023 FINALIZED
23MCN003 - Summer Spill Patterns 11-MAY-2023 WITHDRAWN
23MCN004 - Fall Surface Spill 30-AUG-2023 FINALIZED
Draft Chapter 6 - Ice Harbor Dam 23IHR001 - Unit 3 Range 3-FEB-2023 FINALIZED
23IHR002 - Adult Steelhead Spill 2023 8-FEB-2023 FINALIZED
23IHR003 - Monthly STS Inspections 3-FEB-2023 FINALIZED
23IHR004 - Single Unit Operation 7-FEB-2023 WITHDRAWN
23IHR005 - South Shore Facility 3-FEB-2023 FINALIZED
23IHR006 - Fall Surface Spill 30-AUG-2023 FINALIZED
Draft Chapter 7 - Lower Monumental Dam 23LMN001 - Early JBS Start 18-JAN-2023 FINALIZED
23LMN002 - Adult Steelhead Spill 2023 8-FEB-2023 FINALIZED
23LMN003 - Gatewell Drawdowns 9-FEB-2023 FINALIZED
23LMN004 - STS Inspections 6-FEB-2023 FINALIZED
23LMN005 - Unit 5 Priority 3-FEB-2023 FINALIZED
23LMN006 - Fall Surface Spill 30-AUG-2023 FINALIZED
Draft Chapter 8 - Little Goose Dam 23LGS001 - Early JBS Start 18-JAN-2023 FINALIZED
23LGS002 - Adult Steelhead Spill 2023 8-FEB-2023 FINALIZED
23LGS003 - Fall Surface Spill 30-AUG-2023 FINALIZED
Draft Chapter 9 - Lower Granite Dam 23LWG001 - Adult Steelhead Spill 2023 8-FEB-2023 FINALIZED
23LWG002 - Fall Surface Spill 30-AUG-2023 FINALIZED
Draft Appendices
Change Forms Date
Posted
Change Form
Status
Draft Appendix A - Special Ops & Studies 23AppA001 - Doble Schedule 17-FEB-2023 FINALIZED
Draft Appendix B - Transport Plan 23AppB001 - No LMN Summer 3-FEB-2023 FINALIZED
Draft Appendix C - BPA Load Shaping Guidelines
Draft Appendix D - Ops for Non-Listed Species
Draft Appendix E - Fish Operations Plan (FOP) N/A (coordinated via RIOG) ------ ------
Draft Appendix F - Dewatering Fish Salvage
Draft Appendix G - Adult Trap Ops
Draft Appendix H - CHJ Turbine Dewatering
Draft Appendix I - DWR Turbine Maintenance 23AppI001 - DWR Turbine Test Sequence 9-FEB-2023 FINALIZED
Draft Appendix J - Smolt Facility Protocols 23AppJ001 - LMN LGS JBS Start FINALIZED
Draft Appendix K - Acronyms
Draft Appendix L - Predator Mgmt Plans 23AppL001 - NWW Updates 3-FEB-2023 FINALIZED
23AppL002 - Pinniped Monitoring 11-MAY-2023 FINALIZED
 