Draft 2022 Fish Passage Plan (FPP)
& Change Forms
* Change Forms approved after March 1, 2022, are NOT included in the print version of the 2022 FPP.
Draft Chapters
Change Forms
Date
Posted
Change Form
Status
Draft Chapter 1 - Overview
Draft Chapter 2 - Bonneville Dam
22BON001 - Unit Maintenance
10-FEB-2022
APPROVED
22BON002 - STS Removal
10-FEB-2022
APPROVED
22BON003 - 2.4.2.7. Channel Velocity
11-AUG-2022
APPROVED
Draft Chapter 3 - The Dalles Dam
22TDA001 - Flow Velocity
10-FEB-2022
APPROVED
22TDA002 - Spillgate Maintenance
27-JAN-2022
APPROVED
22TDA003 - Gatewell Monitoring
27-JAN-2022
APPROVED
22TDA004 - Unit Outage Sluicegate
27-JAN-2022
APPROVED
22TDA005 - Orifice Blocker Install
27-JAN-2022
APPROVED
22TDA006 - AWS Backup Inclusion
27-JAN-2022
APPROVED
Draft Chapter 4 - John Day Dam
22JDA001 - Condition Sampling
10-FEB-2022
APPROVED
22JDA002 - Fish Counts
9-FEB-2022
APPROVED
22JDA003 - Fish Pumps
27-JAN-2022
APPROVED
22JDA004 - Channel Velocity
27-JAN-2022
APPROVED
22JDA005 - North Fishway
27-JAN-2022
APPROVED
22JDA006 - Ladder Temperature Dates
27-JAN-2022
APPROVED
22JDA007 - STS Removal Schedule
10-FEB-2022
APPROVED
22JDA008 - Orifice Operation
*
28-APR-2022 *
APPROVED
Draft Chapter 5 - McNary Dam
22MCN001 - Spill for Adult Steelhead
27-JAN-2022
APPROVED
22MCN002 - TSW Removal Spill Pattern
27-JAN-2022
APPROVED
22MCN003 - Orifice Operation
10-FEB-2022
APPROVED
22MCN004 - Modified Spill Patterns
*
29-APR-2022 *
APPROVED
22MCN005 - Macro/Micro Spill Operations
*
14-JUL-2022 *
APPROVED
Draft Chapter 6 - Ice Harbor Dam
22IHR001 - Spill for Adult Steelhead
27-JAN-2022
APPROVED
22IHR002 - Ladder Exit Trashracks
27-JAN-2022
APPROVED
22IHR003 - Orifice Operation
10-FEB-2022
APPROVED
22IHR004 - STS Removal
27-JAN-2022
APPROVED
Draft Chapter 7 - Lower Monumental Dam
22LMN001 - Spill for Adult Steelhead
27-JAN-2022
APPROVED
22LMN002 - Orifice Operation
10-FEB-2022
APPROVED
22LMN003 - STS Removal
27-JAN-2022
APPROVED
22LMN004 - Spill Patterns No Bay 3
10-FEB-2022
APPROVED
Draft Chapter 8 - Little Goose Dam
22LGS001 - Spill for Adult Steelhead
27-JAN-2022
APPROVED
22LGS002 - Orifice Operation
10-FEB-2022
APPROVED
22LGS003 - ESBS Removal
27-JAN-2022
APPROVED
22LGS004 - ASW Crest Elevation
*
15-JUN-2022 *
APPROVED
22LGS005 - ASW Closure Criteria
9-JUN-2022
WITHDRAWN
Draft Chapter 9 - Lower Granite Dam
22LWG001 - Spill for Adult Steelhead
27-JAN-2022
APPROVED
22LWG002 - Delete 2021 Early Bypass
27-JAN-2022
APPROVED
22LWG003 - ESBS Removal
27-JAN-2022
APPROVED
22LWG004 - Orifice Operation
10-FEB-2022
APPROVED
Draft Appendices
Change Forms
Date
Posted
Change Form
Status
Draft Appendix A - Special Ops & Studies
22AppA001 - Doble Test Schedule
7-FEB-2022
APPROVED
Draft Appendix B - Transport Plan
Draft Appendix C - BPA Load Shaping Guidelines
Draft Appendix D - Ops for Non-Listed Species
Draft Appendix E - Fish Operations Plan (FOP)
N/A (coordinated via RIOG)
------
------
Draft Appendix F - Dewatering Fish Salvage
22AppF001 - Invasive Species Removal
27-JAN-2022
APPROVED
Draft Appendix G - Adult Trap Ops
22AppG001 - Lamprey Trapping Temps
27-JAN-2022
APPROVED
Draft Appendix H - CHJ Turbine Dewatering
Draft Appendix I - DWR Turbine Maintenance
Draft Appendix J - Smolt Facility Protocols
22AppJ001 - JDA Condition Monitoring
10-FEB-2022
APPROVED
Draft Appendix K - Acronyms
Draft Appendix L - Predator Mgmt Plans
22AppL001 - JDA Updates
27-JAN-2022
APPROVED
22AppL002 - NWW Updates
27-JAN-2022
APPROVED
22AppL003 - LMN Bird Monitoring
*
10-MAR-2022 *
APPROVED
Fish Passage Plan Homepage