Draft 2021 Fish Passage Plan (FPP)
& Change Forms

* Change Forms approved after March 1, 2021, are NOT included in the print version of the 2021 FPP.

Draft Project-Specific Chapters Change Forms Posted Change Form
Status
Draft Chapter 1 - Overview
Draft Chapter 2 - Bonneville Dam 21BON001 - Temperature Monitor Locations 12-FEB-2021  APPROVED
21BON002 - Turbine Range Updates 11-MAR-2021  APPROVED
21BON003 - PH2 Mid-Range Criteria 20-APR-2021  WITHDRAWN
Draft Chapter 3 - The Dalles Dam 21TDA001 - Turbine Range Updates 11-MAR-2021  APPROVED
21TDA002 - Unit 8-2 Sluicegate 10-JUN-2021  APPROVED
Draft Chapter 4 - John Day Dam 21JDA001 - Bay 2 Attraction Flow 2-FEB-2021  APPROVED
21JDA002 - Update Locked-Blade Units 2-FEB-2021  APPROVED
21JDA003 - Turbine Range Updates 11-MAR-2021  APPROVED
21JDA004 - Update Unit 10 Range 8-APR-2021  APPROVED
Draft Chapter 5 - McNary Dam 21MCN001 - Adult Bull Trout Counts 8-FEB-2021  APPROVED
21MCN002 - Spill Pattern Change 12-FEB-2021  APPROVED
21MCN003 - Spill for Steelhead Overshoots 2-FEB-2021  APPROVED
21MCN004 - Turbine Range Updates 11-MAR-2021  APPROVED
21MCN005 - Corrected Table MCN-7 8-APR-2021  APPROVED
21MCN006 - Unit 5 Locked Blades 10-NOV-2021  APPROVED
Draft Chapter 6 - Ice Harbor Dam 21IHR001 - Adult Bull Trout Counts 8-FEB-2021  APPROVED
21IHR002 - Spill for Steelhead Overshoots 2-FEB-2021  APPROVED
21IHR003 - RSW Updates 2-FEB-2021  APPROVED
21IHR004 - Turbine Range Updates 11-MAR-2021  APPROVED
21IHR005 - Unit 4 Range 10-JUN-2021  APPROVED
21IHR006 - RSW Spill Rates 14-OCT-2021  APPROVED
21IHR007 - Unit 2 Range 14-OCT-2021  APPROVED
Draft Chapter 7 - Lower Monumental Dam 21LMN001 - Adult Bull Trout Counts 8-FEB-2021  APPROVED
21LMN002 - Update Locked-Blade Units 2-FEB-2021  APPROVED
21LMN003 - Spill for Steelhead Overshoots 2-FEB-2021  APPROVED
21LMN004 - RSW Updates 2-FEB-2021  APPROVED
21LMN005 - Turbine Range Updates 11-MAR-2021  APPROVED
21LMN006 - RSW Spill Rates 14-OCT-2021  APPROVED
Draft Chapter 8 - Little Goose Dam 21LGS001 - Adult Bull Trout Counts 8-FEB-2021  APPROVED
21LGS002 - Spill for Steelhead Overshoots 2-FEB-2021  APPROVED
21LGS003 - Unit 1 Special Op; Unit 6 Priority 12-FEB-2021  APPROVED
21LGS004 - ASW During 30% Spill 12-FEB-2021  WITHDRAWN
21LGS005 - Turbine Range Updates 11-MAR-2021  APPROVED
21LGS006 - ASW Spill Rates 14-OCT-2021  APPROVED
Draft Chapter 9 - Lower Granite Dam 21LWG001 - Early JBS Dewater 2-FEB-2021  APPROVED
21LWG002 - Adult Bull Trout Counts 8-FEB-2021  APPROVED
21LWG003 - Spill for Steelhead Overshoots 2-FEB-2021  APPROVED
21LWG004 - RSW August Operation 12-FEB-2021  APPROVED
21LWG005 - Turbine Range Updates 11-MAR-2021  APPROVED
21LWG006 - RSW Criteria and Spill Rate 9-SEP-2021  APPROVED
Draft Appendices
Change Forms Posted Change Form
Status
Draft Appendix A - Special Ops & Studies 21AppA001 - Doble Outage Schedule 12-FEB-2021  APPROVED
21AppA002 - Add DWR Doble Schedule 9-SEP-2021  APPROVED
Draft Appendix B - Transport Plan 21AppB001 - LMN Condition Monitoring 10-JUN-2021 Moved to App J
21AppB002 - Correct Barge End Date 10-JUN-2021  APPROVED
21AppB003 - Additional Truck Transport 8-JUL-2021  APPROVED
Draft Appendix C - BPA Load Shaping Guidelines 21AppC001 - BPA's Load Shaping Guidelines 11-MAR-2021  APPROVED
Draft Appendix D - Ops for Non-Listed Species
Draft Appendix E - Fish Operations Plan (FOP) N/A (coordinated via RIOG) ------ ------
Draft Appendix F - Dewatering Fish Salvage
Draft Appendix G - Adult Trap Ops BON, IHR, LWG
Draft Appendix H - CHJ Turbine Dewatering
Draft Appendix I - DWR Turbine Maintenance 21AppI001 - Dworshak Maintenance 9-SEP-2021  APPROVED
Draft Appendix J - Smolt Facility Protocols 21AppJ001 - Snake River High Temperature Protocols 13-AUG-2021  APPROVED
21AppJ002 - LMN Condition Monitoring 23-SEP-2021  APPROVED
Draft Appendix K - Acronyms
Draft Appendix L - Predator Mgmt Plans 21AppL001 - Predator Plan Updates 22-FEB-2021  APPROVED
2AppL002 - Correct Pinniped Hazing Dates 11-MAR-2021  APPROVED
2AppL003 - Add Fall Pinniped Hazing Dates 9-SEP-2021  APPROVED
 