Draft 2021 Fish Passage Plan (FPP)
& Change Forms
* Change Forms approved after March 1, 2021, are NOT included in the print version of the 2021 FPP.
Draft Project-Specific Chapters
Change Forms
Posted
Change Form
Status
Draft Chapter 1 - Overview
Draft Chapter 2 - Bonneville Dam
21BON001 - Temperature Monitor Locations
12-FEB-2021
APPROVED
21BON002 - Turbine Range Updates
11-MAR-2021
APPROVED
21BON003 - PH2 Mid-Range Criteria
20-APR-2021
WITHDRAWN
Draft Chapter 3 - The Dalles Dam
21TDA001 - Turbine Range Updates
11-MAR-2021
APPROVED
21TDA002 - Unit 8-2 Sluicegate
10-JUN-2021
APPROVED
Draft Chapter 4 - John Day Dam
21JDA001 - Bay 2 Attraction Flow
2-FEB-2021
APPROVED
21JDA002 - Update Locked-Blade Units
2-FEB-2021
APPROVED
21JDA003 - Turbine Range Updates
11-MAR-2021
APPROVED
21JDA004 - Update Unit 10 Range
8-APR-2021
APPROVED
Draft Chapter 5 - McNary Dam
21MCN001 - Adult Bull Trout Counts
8-FEB-2021
APPROVED
21MCN002 - Spill Pattern Change
12-FEB-2021
APPROVED
21MCN003 - Spill for Steelhead Overshoots
2-FEB-2021
APPROVED
21MCN004 - Turbine Range Updates
11-MAR-2021
APPROVED
21MCN005 - Corrected Table MCN-7
8-APR-2021
APPROVED
21MCN006 - Unit 5 Locked Blades
10-NOV-2021
APPROVED
Draft Chapter 6 - Ice Harbor Dam
21IHR001 - Adult Bull Trout Counts
8-FEB-2021
APPROVED
21IHR002 - Spill for Steelhead Overshoots
2-FEB-2021
APPROVED
21IHR003 - RSW Updates
2-FEB-2021
APPROVED
21IHR004 - Turbine Range Updates
11-MAR-2021
APPROVED
21IHR005 - Unit 4 Range
10-JUN-2021
APPROVED
21IHR006 - RSW Spill Rates
14-OCT-2021
APPROVED
21IHR007 - Unit 2 Range
14-OCT-2021
APPROVED
Draft Chapter 7 - Lower Monumental Dam
21LMN001 - Adult Bull Trout Counts
8-FEB-2021
APPROVED
21LMN002 - Update Locked-Blade Units
2-FEB-2021
APPROVED
21LMN003 - Spill for Steelhead Overshoots
2-FEB-2021
APPROVED
21LMN004 - RSW Updates
2-FEB-2021
APPROVED
21LMN005 - Turbine Range Updates
11-MAR-2021
APPROVED
21LMN006 - RSW Spill Rates
14-OCT-2021
APPROVED
Draft Chapter 8 - Little Goose Dam
21LGS001 - Adult Bull Trout Counts
8-FEB-2021
APPROVED
21LGS002 - Spill for Steelhead Overshoots
2-FEB-2021
APPROVED
21LGS003 - Unit 1 Special Op; Unit 6 Priority
12-FEB-2021
APPROVED
21LGS004 - ASW During 30% Spill
12-FEB-2021
WITHDRAWN
21LGS005 - Turbine Range Updates
11-MAR-2021
APPROVED
21LGS006 - ASW Spill Rates
14-OCT-2021
APPROVED
Draft Chapter 9 - Lower Granite Dam
21LWG001 - Early JBS Dewater
2-FEB-2021
APPROVED
21LWG002 - Adult Bull Trout Counts
8-FEB-2021
APPROVED
21LWG003 - Spill for Steelhead Overshoots
2-FEB-2021
APPROVED
21LWG004 - RSW August Operation
12-FEB-2021
APPROVED
21LWG005 - Turbine Range Updates
11-MAR-2021
APPROVED
21LWG006 - RSW Criteria and Spill Rate
9-SEP-2021
APPROVED
Draft Appendices
Change Forms
Posted
Change Form
Status
Draft Appendix A - Special Ops & Studies
21AppA001 - Doble Outage Schedule
12-FEB-2021
APPROVED
21AppA002 - Add DWR Doble Schedule
9-SEP-2021
APPROVED
Draft Appendix B - Transport Plan
21AppB001 - LMN Condition Monitoring
10-JUN-2021
Moved to App J
21AppB002 - Correct Barge End Date
10-JUN-2021
APPROVED
21AppB003 - Additional Truck Transport
8-JUL-2021
APPROVED
Draft Appendix C - BPA Load Shaping Guidelines
21AppC001 - BPA's Load Shaping Guidelines
11-MAR-2021
APPROVED
Draft Appendix D - Ops for Non-Listed Species
Draft Appendix E - Fish Operations Plan (FOP)
N/A (coordinated via RIOG)
------
------
Draft Appendix F - Dewatering Fish Salvage
Draft Appendix G - Adult Trap Ops BON, IHR, LWG
Draft Appendix H - CHJ Turbine Dewatering
Draft Appendix I - DWR Turbine Maintenance
21AppI001 - Dworshak Maintenance
9-SEP-2021
APPROVED
Draft Appendix J - Smolt Facility Protocols
21AppJ001 - Snake River High Temperature Protocols
13-AUG-2021
APPROVED
21AppJ002 - LMN Condition Monitoring
23-SEP-2021
APPROVED
Draft Appendix K - Acronyms
Draft Appendix L - Predator Mgmt Plans
21AppL001 - Predator Plan Updates
22-FEB-2021
APPROVED
2AppL002 - Correct Pinniped Hazing Dates
11-MAR-2021
APPROVED
2AppL003 - Add Fall Pinniped Hazing Dates
9-SEP-2021
APPROVED