Draft 2020 Fish Passage Plan (FPP)
& Change Forms
* Change Forms approved after March 1, 2020, are NOT included in the print version of the 2020 FPP.
Draft Project-Specific Chapters
Edits shown in Track Changes
Change Forms
Posted
Change Form
Status
Draft Chapter 1 - Overview
20OVE001 - Update BiOp
24-JAN-2020
APPROVED
Draft Chapter 2 - Bonneville Dam
20BON001 - Ladder Temperature Monitoring
13-FEB-2020
WITHDRAWN
20BON002 - PH2 Mid-Range Spill
13-FEB-2020
APPROVED
20BON003 - Reduced Nighttime Flow
12-MAR-2020
WITHDRAWN
Draft Chapter 3 - The Dalles Dam
20TDA001 - AWS Operation
24-JAN-2020
APPROVED
20TDA002 - Avian Abatement
30-JAN-2020
APPROVED
20TDA003 - ITS Operation
24-JAN-2020
APPROVED
20TDA004 - Picket Seating
30-JAN-2020
APPROVED
20TDA005 - AWS With One FU
30-JAN-2020
APPROVED
20TDA006 - ITS U1 and U18
30-JAN-2020
APPROVED
20TDA007 - Outage Schedule
30-JAN-2020
APPROVED
20TDA008 - Spillbay 9 Footnote
30-JAN-2020
APPROVED
20TDA009 - Reduced Nighttime Flow
12-MAR-2020
WITHDRAWN
20TDA010 - Dewater Below Tailwater
*
17-NOV-2020 *
APPROVED
Draft Chapter 4 - John Day Dam
20JDA001 - Remove March 1 Bypass Start
24-JAN-2020
APPROVED
20JDA002 - Range for Locked-Blade Units
13-FEB-2020
APPROVED
20JDA003 - TSW Installation
8-OCT-2020
WITHDRAWN
Draft Chapter 5 - McNary Dam
20MCN001 - March 1 Bypass Start
24-JAN-2020
APPROVED
20MCN002 - Automated Temperature Monitoring
30-JAN-2020
WITHDRAWN
20MCN003 - Range for Locked-Blade Units
13-FEB-2020
APPROVED
Draft Chapter 6 - Ice Harbor Dam
20IHR001 - Turbine Ranges
24-JAN-2020
APPROVED
20IHR002 - Automated Temperature Monitoring
30-JAN-2020
WITHDRAWN
20IHR003 - Operating Gates Position
10-NOV-2020
WITHDRAWN
Draft Chapter 7 - Lower Monumental Dam
20LMN001 - Operating Gates Position
4-FEB-2020
APPROVED
20LMN002 - Remove March 1 Bypass Start
24-JAN-2020
APPROVED
20LMN003 - Automated Temperature Monitoring
30-JAN-2020
WITHDRAWN
20LMN004 - Units 4, 5 Locked Blades
4-FEB-2020
APPROVED
20LMN005 - Range for Locked-Blade Units
*
17-MAR-2020 *
APPROVED
20LMN006 - Units 2, 4, 5 Priority Order
*
11-JUN-2020 *
APPROVED
Draft Chapter 8 - Little Goose Dam
20LGS001 - ESBS Cleaning Brushes
30-JAN-2020
APPROVED
20LGS002 - ESBS Unscheduled Maintenance
30-JAN-2020
APPROVED
20LGS003 - Surface Velocity
13-FEB-2020
APPROVED
20LGS004 - ASW Updates
4-FEB-2020
APPROVED
20LGS005 - Automated Temperature Monitoring
30-JAN-2020
WITHDRAWN
Draft Chapter 9 - Lower Granite Dam
20LWG001 - March 1 Bypass Start
24-JAN-2020
APPROVED
20LWG002 - Automated Temperature Monitoring
30-JAN-2020
WITHDRAWN
20LWG003 - Range for Locked-Blade Units
13-FEB-2020
APPROVED
20LWG004 - Higher Spring Spill Patterns
*
11-JUN-2020 *
APPROVED
Draft Appendices
All approved changes shown in Track Changes
Change Forms
Posted*
Change Form
Status
Draft Appendix A - Special Ops & Studies
20AppA001 - Doble Test Schedule
4-FEB-2020
APPROVED
20AppA002 - Spill for Steelhead Overshoots
10-SEP-2020
APPROVED
Draft Appendix B - Transport Plan
20AppB001 - Transport Updates
4-FEB-2020
APPROVED
20AppB002 - Additional Transport Truck
*
11-JUN-2020 *
APPROVED
Draft Appendix C - BPA Load Shaping Guidelines
none
---
---
Draft Appendix D - Ops for Non-Listed Species
none
---
---
Draft Appendix E - Fish Operations Plan (FOP)
N/A (coordinated via RIOG)
---
---
Draft Appendix F - Dewatering Fish Salvage
20AppF001 - Sturgeon Coordination
14-JAN-2021
APPROVED
Draft Appendix G - Adult Trap Ops BON, IHR, LWG
20AppG001 - Adult Trap Water Supply
13-FEB-2020
APPROVED
20AppG002 - Adult Trap Water Temperatures
26-FEB-2020
APPROVED
20AppG003 - LWG Trap Dewatering
*
8-OCT-2020 *
APPROVED
Draft Appendix H - CHJ Turbine Dewatering
none
---
---
Draft Appendix I - DWR Turbine Maintenance
none
---
---
Draft Appendix J - Smolt Facility Ops BON, JDA, MCN
20AppJ001 - MCN March 1 Start
4-FEB-2020
APPROVED
20AppJ002 - JDA Index Sampling
*
9-APR-2020 *
APPROVED
Draft Appendix K - Acronyms
none
---
---
Draft Appendix L - Avian Plans
20AppL001 - Table 1 Hazing Schedule
4-FEB-2020
APPROVED
20AppL002 - BON SLEDs
4-FEB-2020
APPROVED
20AppL003 - MCN
4-FEB-2020
APPROVED
20AppL004 - IHR
4-FEB-2020
APPROVED
20AppL005 - LGS
4-FEB-2020
APPROVED
20AppL006 - LWG
4-FEB-2020
APPROVED
20AppL007 - TDA
4-FEB-2020
APPROVED