Draft 2019 Fish Passage Plan (FPP)
& Change Forms
* Change Forms approved after March 1, 2019, are NOT included in print versions of the 2019 FPP.
Draft Project-Specific Chapters
All approved changes shown in Track Changes
Change Forms
Posted
Change Form
Status
Draft Chapter 1 - Overview
Draft Chapter 2 - Bonneville Dam
19BON001 - Add PH2 Mid-Range
2/14/2019
APPROVED
*
19BON002 - Temperature Monitor Locations
3/21/2019
APPROVED
*
19BON003 - SLED Guidelines
7/11/2019
APPROVED
*
19BON004 - Day/Night Hours
7/11/2019
APPROVED
Draft Chapter 3 - The Dalles Dam
19TDA001 - AWS Backup
2/8/2019
APPROVED
19TDA002 - Delete Zebra Mussel Duplicate
2/8/2019
APPROVED
19TDA003 - AWS Backup Operation
2/8/2019
APPROVED
*
19TDA004 - AWS Backup Operation 2
4/11/2019
APPROVED
Draft Chapter 4 - John Day Dam
19JDA001 - March 1 Bypass Start
2/8/2019
APPROVED
Draft Chapter 5 - McNary Dam
19MCN001 - Work Near Fishway
2/7/2019
Withdrawn
19MCN002 - Ladder Temperature Map Update
2/8/2019
APPROVED
19MCN003 - Fishway Temperature Reporting
2/8/2019
APPROVED
19MCN004 - Unit 6 Fixed Blade
2/14/2019
APPROVED
Draft Chapter 6 - Ice Harbor Dam
19IHR001 - Work Near Fishway
2/7/2019
Withdrawn
19IHR002 - Lamprey Structure Operation
2/14/2019
APPROVED
19IHR003 - Ladder Entrance Operation
2/8/2019
APPROVED
19IHR004 - Update Unit Status
2/8/2019
APPROVED
*
19IHR005 - Units 5-6 Range
7/11/2019
APPROVED
Draft Chapter 7 - Lower Monumental Dam
19LMN001 - Work Near Fishway
2/7/2019
Withdrawn
19LMN002 - Add March 1 Bypass Start
2/8/2019
APPROVED
19LMN003 - Update Fixed Blade Units
2/8/2019
APPROVED
Draft Chapter 8 - Little Goose Dam
19LGS001 - Work Near Fishway
2/7/2019
Withdrawn
19LGS002 - Delete March 1 Bypass Start
2/8/2019
APPROVED
19LGS003 - Fishway Cooling Pump Criteria
2/8/2019
APPROVED
19LGS004 - Channel Velocity
7/11/2019
Withdrawn
19LGS005 - Unit Priority
2/14/2019
APPROVED
19LGS006 - Fishway Temperature Reporting
2/8/2019
APPROVED
Draft Chapter 9 - Lower Granite Dam
19LWG001 - Work Near Fishway
2/7/2019
Withdrawn
19LWG002 - Close FOGs
2/14/2019
APPROVED
19LWG003 - Fishway Cooling Pump Criteria
2/8/2019
APPROVED
19LWG004 - Fishway Temperature Reporting
2/8/2019
APPROVED
Draft Appendices
All approved changes shown in Track Changes
Change Forms
Posted*
Change Form
Status
Draft Appendix A - Special Ops & Studies
19AppA001 - Doble Testing Schedule
2/8/2019
APPROVED
Draft Appendix B - Transport Plan
19AppB001 - Updates for 2019
2/8/2019
APPROVED
Draft Appendix C - BPA Load Shaping Guidelines
Draft Appendix D - Ops for Non-Listed Species
19AppD001 - Updates for TDA
2/8/2019
APPROVED
19AppD002 - Updates for JDA
2/8/2019
APPROVED
19AppD003 - Updates for NWW
2/8/2019
APPROVED
Draft Appendix E - Fish Operations Plan (FOP)
N/A (coordinated via RIOG)
Draft Appendix F - Dewatering Fish Salvage
Draft Appendix G - Adult Trap Ops BON, IHR, LWG
19AppG001 - BON Weir 37 Notification
2/8/2019
APPROVED
19AppG002 - BON Mortality Notification
2/8/2019
APPROVED
Draft Appendix H - CHJ Turbine Dewatering
Draft Appendix I - DWR Turbine Maintenance
19AppI001 - New DWR Section
2/14/2019
APPROVED
Draft Appendix J - Smolt Facility Ops BON, JDA, MCN
Draft Appendix K - Acronyms
19AppK001 - Add SNL Acronym
2/8/2019
APPROVED
Draft Appendix L - Avian Plans
19AppL001 - Updates for MCN
2/14/2019
APPROVED
19AppL002 - Updates for IHR
2/14/2019
APPROVED
19AppL003 - Updates for LMN
2/14/2019
APPROVED
19AppL004 - Updates for LGS
2/14/2019
APPROVED
19AppL005 - Updates for LWG
2/14/2019
APPROVED
19AppL006 - Add Hazing Table
2/14/2019
APPROVED
Fish Passage Plan Homepage