Draft 2019 Fish Passage Plan (FPP)
& Change Forms

* Change Forms approved after March 1, 2019, are NOT included in print versions of the 2019 FPP.

Draft Project-Specific Chapters
All approved changes shown in Track Changes
Change Forms Posted Change Form
Status
Draft Chapter 1 - Overview      
Draft Chapter 2 - Bonneville Dam 19BON001 - Add PH2 Mid-Range 2/14/2019  APPROVED
*19BON002 - Temperature Monitor Locations 3/21/2019  APPROVED
*19BON003 - SLED Guidelines 7/11/2019  APPROVED
*19BON004 - Day/Night Hours 7/11/2019  APPROVED
Draft Chapter 3 - The Dalles Dam 19TDA001 - AWS Backup 2/8/2019  APPROVED
19TDA002 - Delete Zebra Mussel Duplicate 2/8/2019  APPROVED
19TDA003 - AWS Backup Operation 2/8/2019  APPROVED
*19TDA004 - AWS Backup Operation 2 4/11/2019  APPROVED
Draft Chapter 4 - John Day Dam 19JDA001 - March 1 Bypass Start 2/8/2019  APPROVED
Draft Chapter 5 - McNary Dam 19MCN001 - Work Near Fishway 2/7/2019  Withdrawn
19MCN002 - Ladder Temperature Map Update 2/8/2019  APPROVED
19MCN003 - Fishway Temperature Reporting 2/8/2019  APPROVED
19MCN004 - Unit 6 Fixed Blade 2/14/2019  APPROVED
Draft Chapter 6 - Ice Harbor Dam 19IHR001 - Work Near Fishway 2/7/2019  Withdrawn
19IHR002 - Lamprey Structure Operation 2/14/2019  APPROVED
19IHR003 - Ladder Entrance Operation 2/8/2019  APPROVED
19IHR004 - Update Unit Status 2/8/2019  APPROVED
*19IHR005 - Units 5-6 Range 7/11/2019  APPROVED
Draft Chapter 7 - Lower Monumental Dam 19LMN001 - Work Near Fishway 2/7/2019  Withdrawn
19LMN002 - Add March 1 Bypass Start 2/8/2019  APPROVED
19LMN003 - Update Fixed Blade Units 2/8/2019  APPROVED
Draft Chapter 8 - Little Goose Dam 19LGS001 - Work Near Fishway 2/7/2019  Withdrawn
19LGS002 - Delete March 1 Bypass Start 2/8/2019  APPROVED
19LGS003 - Fishway Cooling Pump Criteria 2/8/2019  APPROVED
19LGS004 - Channel Velocity 7/11/2019  Withdrawn
19LGS005 - Unit Priority 2/14/2019  APPROVED
19LGS006 - Fishway Temperature Reporting 2/8/2019  APPROVED
Draft Chapter 9 - Lower Granite Dam 19LWG001 - Work Near Fishway 2/7/2019  Withdrawn
19LWG002 - Close FOGs 2/14/2019  APPROVED
19LWG003 - Fishway Cooling Pump Criteria 2/8/2019  APPROVED
19LWG004 - Fishway Temperature Reporting 2/8/2019  APPROVED
Draft Appendices
All approved changes shown in Track Changes
Change Forms Posted* Change Form
Status
Draft Appendix A - Special Ops & Studies 19AppA001 - Doble Testing Schedule 2/8/2019  APPROVED
Draft Appendix B - Transport Plan 19AppB001 - Updates for 2019 2/8/2019  APPROVED
Draft Appendix C - BPA Load Shaping Guidelines      
Draft Appendix D - Ops for Non-Listed Species 19AppD001 - Updates for TDA 2/8/2019  APPROVED
19AppD002 - Updates for JDA 2/8/2019  APPROVED
19AppD003 - Updates for NWW 2/8/2019  APPROVED
Draft Appendix E - Fish Operations Plan (FOP) N/A (coordinated via RIOG)
Draft Appendix F - Dewatering Fish Salvage
Draft Appendix G - Adult Trap Ops BON, IHR, LWG 19AppG001 - BON Weir 37 Notification 2/8/2019  APPROVED
19AppG002 - BON Mortality Notification 2/8/2019  APPROVED
Draft Appendix H - CHJ Turbine Dewatering
Draft Appendix I - DWR Turbine Maintenance 19AppI001 - New DWR Section 2/14/2019  APPROVED
Draft Appendix J - Smolt Facility Ops BON, JDA, MCN
Draft Appendix K - Acronyms 19AppK001 - Add SNL Acronym 2/8/2019  APPROVED
Draft Appendix L - Avian Plans 19AppL001 - Updates for MCN 2/14/2019  APPROVED
19AppL002 - Updates for IHR 2/14/2019  APPROVED
19AppL003 - Updates for LMN 2/14/2019  APPROVED
19AppL004 - Updates for LGS 2/14/2019  APPROVED
19AppL005 - Updates for LWG 2/14/2019  APPROVED
19AppL006 - Add Hazing Table 2/14/2019  APPROVED
 