Draft 2018 Fish Passage Plan (FPP)
& Change Forms

* Change Forms approved after March 1, 2018, are NOT included in print versions of the 2018 FPP.

Draft Project-Specific Chapters
All approved changes shown in Track Changes
Change Forms Posted Change Form
Status
Draft Chapter 1 - Overview 18OVE001 - State TDG Terminology 1/11/2018  APPROVED
18OVE002 - Spill Pattern Dates 2/8/2018  APPROVED
Draft Chapter 2 - Bonneville Dam 18BON001 - Table BON-5 Correction 9/14/2017  APPROVED
18BON002 - Add Turbine Operating Limit 2/12/2018  APPROVED
18BON003 - Diffuser Cleaning * 5/24/2018*  APPROVED
18BON004 - Chiller Discharge * 6/14/2018*  APPROVED
18BON005 - Unit Priority Change * 6/14/2018*  APPROVED
Draft Chapter 3 - The Dalles Dam 18TDA001 - Add Turbine Operating Limit 2/12/2018  APPROVED
18TDA002 - PUD Outage Time * 6/14/2018*  APPROVED
Draft Chapter 4 - John Day Dam 18JDA001 - March 1 Bypass Start 1/11/2018  APPROVED
18JDA002 - Minimum Spill Correction 1/11/2018  APPROVED
18JDA003 - Add Turbine Operating Limit 2/12/2018  APPROVED
Draft Chapter 5 - McNary Dam 18MCN001 - Work Near Fishway 9/6/2018  Moved to 2019
18MCN002 - Add Turbine Operating Limit 2/12/2018  APPROVED
18MCN003 - ESBS Schedule * 3/20/2018*  APPROVED
Draft Chapter 6 - Ice Harbor Dam 18IHR001 - AWS High Tailwater 9/14/2017  APPROVED
18IHR002 - Work Near Fishway 9/6/2018  Moved to 2019
18IHR003 - Unit 2 Priority 1/11/2018  APPROVED
18IHR004 - Ladder Exit Criteria 1/11/2018  APPROVED
18IHR005 - Add Turbine Operating Limit 2/12/2018  APPROVED
Draft Chapter 7 - Lower Monumental Dam 18LMN001 - Table LMN-11 10/14/2017  APPROVED
18LMN002 - Work Near Fishway 9/6/2018  Moved to 2019
18LMN003 - Update Units 1-4 2/8/2018  APPROVED
18LMN004 - Add Turbine Operating Limit 2/12/2018  APPROVED
Draft Chapter 8 - Little Goose Dam 18LGS001 - March 1 Bypass Start 1/11/2018  APPROVED
18LGS002 - Work Near Fishway 9/6/2018 Moved to 2019
18LGS003 - Orifice Checks 1/26/2018  APPROVED
18LGS004 - Differentials 1/11/2018  APPROVED
18LGS005 - North Unit Priority Order 2/14/2018  APPROVED
18LGS006 - Add Gas Cap Spill Patterns 2/14/2018  APPROVED
18LGS007 - ASW Updates 2/14/2018  APPROVED
18LGS008 - Add Turbine Operating Limit 2/12/2018  APPROVED
18LGS009 - Fish Pump Criteria * 6/18/2018*  APPROVED
18LGS010 - ASW Criteria * 9/13/2018*  APPROVED
Draft Chapter 9 - Lower Granite Dam 18LWG001 - Work Near Fishway 9/6/2018 Moved to 2019
18LWG002 - Updates for Units 1-2 2/8/2018  APPROVED
18LWG003 - Add Turbine Operating Limit 2/12/2018  APPROVED
18LWG004 - Position of Operating Gates * 6/14/2018*  APPROVED
18LWG005 - JBS Upgrade * 6/14/2018*  APPROVED
Draft Appendices
All approved changes shown in Track Changes
Change Forms Posted* Change Form
Status
Draft Appendix A - Special Ops & Studies 18AppA001 - Doble Testing Schedule 1/11/2018  APPROVED
Draft Appendix B - Transport Plan 18AppB001 - March 1 LGS Bypass Start 1/11/2018  APPROVED
18AppB002 - LMN Transport 1/11/2018  APPROVED
Draft Appendix C - BPA Load Shaping Guidelines
Draft Appendix D - Ops for Non-Listed Species 18AppD001 - Cooling Strainer Inspections 9/14/2017  APPROVED
Draft Appendix E - Fish Operations Plan (FOP) N/A (coordinated via RIOG)
Draft Appendix F - Dewatering Fish Salvage
Draft Appendix G - Adult Trap Ops BON, IHR, LWG 18AppG001 - JBS Upgrade * 6/14/2018*  APPROVED
Draft Appendix H - CHJ Turbine Dewatering
Draft Appendix I - DWR Turbine Maintenance
Draft Appendix J - Smolt Facility Ops BON, JDA, MCN
Draft Appendix K - Acronyms
Draft Appendix L - Avian Plans 18AppL001 - LGS Avian Plan 1/11/2018  APPROVED
 
Fish Passage Plan Homepage