2015 Fish Passage Plan (FPP) Change Forms

Final 2015 Fish Passage Plan

To propose a change to the FPP, submit a completed Change Form to the FPP Coordinator. Please make edits to existing text in "Track Changes" to ensure your proposed changes are captured accurately.

* Approved change forms posted after March 1, 2015, are not included in the printed version of the 2015 FPP.
Change Forms Date Posted* FPOM Status
1 - Overview  
      15OVE001 - FPOM Coordination Feb 12, 2015  Approved
2 - Bonneville Dam  
      15BON001 - Table BON-11 Diffuser Setpoints Aug 14, 2014  Approved
      15BON002 - Turbine Start-up Operation Feb 12, 2015  Approved
      15BON003 - DSM Orifice Control Table BON-7 Feb 12, 2015  Approved
      15BON004 - FOG SLEDs Oct 20, 2014  Approved
      15BON005 - B-Branch Entrance Gates Jan 30, 2015  Approved
      15BON006 - PH2 Mid-Range Dates * June 11, 2015 *  Approved
      15BON007 - Facility Winter Inspections Jan 30, 2015  Approved
      15BON008 - Facility Inspections Jan 30, 2015  Approved
      15BON009 - Fish Salvage Protocols Jan 30, 2015  Approved
      15BON010 - B2CC Winter Priority * Mar 12, 2015 *  Approved
      15BON011 - Split Flows * Aug 13, 2015 *  Approved
3 - The Dalles Dam  
      15TDA001 - TDA-4 Unit Priority Feb 12, 2015  Approved
      15TDA002 - Removable Weirs #154-157 Jan 30, 2015  Approved
      15TDA003 - Fish Lock Feb 12, 2015  Approved
      15TDA004 - New ITS Table Feb 12, 2015  Approved
      15TDA005 - ITS Winter Priority * Mar 12, 2015 *  Approved
      15TDA006 - Sluice Outage Time * June 11, 2015 *  Approved
4 - John Day Dam  
5 - McNary Dam  
      15MCN001 - Delete Nighttime Flow Reduction May 8, 2014  Approved
      15MCN002 - New Section 2.1 Work Near Fishway Jan 30, 2015  Approved
      15MCN003 - Table MCN-9 Spill Patterns Jan 30, 2015  Approved
      15MCN004 - Warm Water Ops Temperature Review Jan 30, 2015  Approved
      15MCN005 - South Shore AWS Ops Feb 12, 2015  Approved
6 - Ice Harbor Dam  
      15IHR001 - New Section 2.1 Work Near Fishway Jan 30, 2015  Approved
      15IHR002 - Adult Counting Method Sep 11, 2014  Approved
      15IHR003 - Turbine Unit Operation Jan 30, 2015  Approved
      15IHR004 - STS Operation Jan 30, 2015  Approved
      15IHR005 - Backflush Orifices Jan 30, 2015  Denied
      15IHR006 - Unit 3 Efficiency Range * May 14, 2015 *  Approved
      15IHR007 - Spill Pattern Correction * May 14, 2015 *  Approved
      15IHR008 - Low Flow Spill Patterns Aug 13, 2015  Withdrawn
7 - Lower Monumental Dam  
      15LMN001 - New Section 2.1 Work Near Fishway Jan 30, 2015  Approved
      15LMN002 - Adult Counting Method Sep 11, 2014  Approved
      15LMN003 - STS Operation Jan 30, 2015  Approved
      15LMN004 - Low Flow Spill Patterns Aug 13, 2015  Withdrawn
8 - Little Goose Dam  
      15LGS001 - Unit 5 Restricted Operation Aug 14, 2014  Approved
      15LGS002 - Unit 1 Low Flow Operation Aug 14, 2014  Approved
      15LGS003 - New Section 2.1 Work Near Fishway Jan 30, 2015  Approved
      15LGS004 - Cold Weather Definition Jan 30, 2015  Approved
      15LGS005 - Unit 1 Clarification * Apr 9, 2015 *  Approved
9 - Lower Granite Dam  
      15LWG001 - New Section 2.1 Work Near Fishway Jan 30, 2015  Approved
      15LWG002 - Season Dates * Mar 31, 2015 *  Approved
      15LWG003 - Spill Pattern Correction * May 14, 2015 *  Approved
      15LWG004 - Low Flow Spill Patterns * July 16, 2015 *  Approved
Appendix A - Special Operations & Studies Feb 12, 2015
Appendix B - Transportation Plan  
      15AppB001 - Truck Transport Minimum #s Jan 30, 2015  Pending
      15AppB002 - Columnaris Operations Jan 30, 2015  Approved
      15AppB003 - Notification Criteria Feb 12, 2015  Approved
      15AppB004 - Collection Facility Operations Feb 12, 2015  Approved
      15AppB005 - Barge Scheduling Changes * Aug 13, 2015 *  Approved
Appendix C - BPA Load Shaping Guidelines  
Appendix D - Operations for Non-Listed Species  
      15AppD001 - JDA Tagged Lamprey Release Sep 11, 2014  Approved
Appendix E - Fish Operations Plan (FOP) Comments via RIOG
Appendix F - Dewatering Fish Salvage  
Appendix G - Adult Trap Ops BON, IHR, LWG  
      15AppG001 - BON AFF Picket Leads Jan 30, 2015  Approved
      15AppG002 - BON Lamprey Trapping Aug 13, 2015  Denied
Appendix H - CHJ Turbine Dewatering  
Appendix I - DWR Turbine Maintenance  
      15AppI001 - DWR Unwatering Protocol Jan 30, 2015  Approved
Appendix J - Smolt Facility Ops BON, JDA, MCN  
      15AppJ001 - BON, JDA Temperature Protocols Aug 14, 2014  Approved
      15AppJ002 - MCN JFF Sampling Protocols Sep 11, 2014  Denied
Appendix K - Acronyms  
Appendix L - Avian Monitoring & Deterrence Plans  
      15AppL001 - New Appendix L Jan 30, 2015  Approved
 