2005 Fish Passage Plan

Full Document   (Bonneville section updated 3/2005) 5,321k

  Cover 124k
  Table of Contents 12k
Section 1 Overview 25k
2 Bonneville   (Tables BON-5, BON-15, Item 2.4.1.2.d updated) 767k
3 The Dalles 1,081k
  7k
  10k
4 John Day 705k
5 McNary 380k
6 Ice Harbor 495k
7 Lower Monumental 223k
8 Little Goose 766k
9 Lower Granite 412k
Appendix A Special Project Operations and Studies 121k
B Corps of Engineeers Juvenile Fish Transportation Plan 34k
C BPA's System Load Shaping Guidelines Regarding Turbine Operation and Best Efficiency 20k
D Corps of Engineers Plan of Action for Dissolved Gas Monitoring in 2005 524k
E Operations Relating to Project Spill for Fish Passage 32k
F Guidelines for Dewatering and Fish Handling Plans 13k
G Protocols for Adult Fish Trapping Operations at Bonneville, Ice Harbor and Lower Granite Dams 49k
H Turbine Dewatering Procedure for Chief Joseph Dam 22k
I List of Acronyms 22k

2004 Final