2003 Fish Passage Plan (Final)

Full Document 5.4 MB
Section 1 Overview 316k
2 Bonneville 1,140k
3 The Dalles 2,969k
4 John Day 763k
5 McNary 554k
6 Ice Harbor 648k
7 Lower Monumental 319k
8 Little Goose 817k
9 Lower Granite 656k
Appendix A Special Project Operations and Studies 466k
B Juvenile Fish Transportation Plan 141k
C BPA's Load Shaping Guidelines To Enable Operating Turbines at Best Efficiency 142k
D Dissolved Gas Monitoring Program Plan of Action for 2003 879k
E Measures Related to Project Spill for Fish Passage (NMFS 2000 BiOp) 160k
F Dewatering Guidelines and Fish Handling (Salvage) Plans 111k
G Protocols for Adult Fish Trapping Operations at BON, IHR, LWG 171k
H Emergency Operations at BON PH2 Adult Fish Facility 135k
I Chief Joseph Dam Turbine Dewatering Procedure 116k
J List of Acronyms 109k