2000 Fish Passage Plan (Final)

Full Document 1.5 MB
Section 1 Overview 22k
2 Bonneville 200k
3 The Dalles 324k
4 John Day 215k
5 McNary 100k
6 Ice Harbor 107k
7 Lower Monumental 73k
8 Little Goose 127k
9 Lower Granite 104k
Appendix A Special Project Operations and Studies 56k
B Juvenile Fish Transportation Plan 44k
C BPA's Load Shaping Guidelines to Enable Operating Turbines at Best Efficiency 19k
D Dissolved Gas Monitoring Program Plan of Action for 2000 302k
E System Spill Operations (Excerpt from 1998 Supplement to 1995 BiOp RPA 2) 57k
F Spill and Total Dissolved Gas 22k
G Dewatering Guidelines and Fish Handling (Salvage) Plans 12k
H Sampling Protocols for Adult Trapping Operations at BON 23k
I List of Acronyms 17k