FPOM Meeting File - May 2023

11 May 2023 FPOM Files

230511 FPOM draft agenda
230511 FPOM audio
230511 FPOM final minutes

11 May 2023 FPOM additional documents

Little Goose Dam Raceway GBT Monitoring Plan_17Mar2023
230511 SOR 2023-1 - Spill Reduction for GBT

230411 NWP NWW critical non-routine fish items
20230511_FPOM_RCC_Update
230511 BPA FPOM updates
11 May 2023 FPOM draft MOCs for discussion

23 LWG 04 MOC LWG LMN Stilling Basin Sediment Removal
23 LGS 06 MOC LGS Stilling Basin Sediment Removal
23 IHR 04 MOC - Unit 3 commissioning
23 LMN 04 MOC Spillbay 6 Repairs
23 LMN 03 MFR Spillbay 8 OOS
23 MCN 05 MFR Spillbay Cranes 6 and 7 have met load limits
23 MCN 04 MFR Spillbay 16 dogging mechcanism update
23 MCN 03 MFR Spillbay 16 dogging mechcanism installation
23 MCN 02 MFR Spillbay 16 closure

23JDA15 MFR spill gate 6 in manual
23JDA14 MFR PDS Chinook Mort
23JDA13 MFR spillgate 12 OOS
23JDA12 MFR Spill Impacted by MU-5 Testing
23BON018 MOC BI Wetted Wall Camera Install
23BON017 MFR BON BI Wetted Wall Optical Sensor install
23BON016 MFR PH2 F1 OOS

11 May 2023 FPP draft Change Form for discussion

23MCN003_Summer-Spill-Patterns
23AppL002_Pinniped-Monitoring