14 April 2022 FPOM Files |
---|
220414 FPOM agenda 220414 FPOM audio 220414 FPOM minutes |
14 April 2022 FPOM additional documents |
NWW Composite Cooling Water Strainers Lamprey Counts 20220414_FPOM_RCC_Update 220414 BPA updates 220414 TDG Monitoring in the Snake River 2020-21_rev2 NWP NWW critical non-routine fish items ranked March Early Start NWW Projects Summary 2018-2022 |
14 April 2022 FPOM draft MOCs for discussion |
22BON004 MOC T12 OOS 22BON007 MOC U14 and U15 B2FGE Hydraulic Testing 22TDA04 MFR Wasco PUD test results 22JDA02 MFR North Fish Pumps Tripped 22JDA03 MFR South Fish Turbine 2 OOS 22 MCN 03 MFR Spill bay 2 and 6 opening delay 22 IHR 03 MFR - South shore AWS pump outage 22 LGS 02 MFR Spillway Gate 3 22 LWG 04 MOC T1T2 Gasket Repair 22 LWG 05 MFR T1 Oil Fill |
14 April 2022 FPP draft Change Form for discussion |
22JDA008_2.3.2.2_Orifice-Operation 22AppI001_DWR-Startup-Procedure |