FPOM Meeting File - August 2020

13 August 2020 FPOM Files
200813 FPOM draft agenda
200813 FPOM final minutes
200813 FPOM audio file

13 August 2020 FPOM additional documents
FPOMOUTAGESCHEDULE_2020
Composite Cooling Water Strainers Lamprey Counts
BPA FPOM outages August- October 2020
MCN TSWs and Summer Fish Passage
LWG GRS vs GRJ Sub yearling detection comparisons FPC 35-20

BON JMF Sinkhole
JDA Spillbay 10 outage 16-23 June 2020
TDA Dewater Turbine SOP

13 August 2020 FPOM draft MOCs for discussion
20BON69 MOC PH2 outage for electrical work
20BON81 MOC Spillway Hydro Survey
20TDA10 MOC PUD Juvenile Bypass Extended Outage
20JDA10 MOC Line 1 Outage to Install Spacers for Intake Crane
20JDA11 MOC Line 3 Outage to Install Spacers for Intake Crane
20JDA12 MOC Spill bay 2 attraction flow
20JDA14 MOC Line 1 Outage - BPA transmission work
20 LMN 08 MOC-Floating Guide Wall Cable Emergency Repair
20 LGS 16 MOC Powerhouse Roof Repair

13 August 2020 FPP draft Change Form for discussion
20IHR003_Position-of-operating-gates
20AppG003_LWG-Dewatering
20IHR003_Position-of-operating-gates w_Cfm comment 12 Aug 2020
Morrill's notes re July FPOM SOG vs ROG
PNNL_29106_LMN_Operating_Gate_FGE_2019_Final_Appendix_B_Raw_Data
PNNL_29106_LMN_Operating_Gate_FGE_2019_Final_Appendix_B_Raw_Data_Metadata