1 1020 1552.66 1199.83 352.83
2 1020 1552.65 1199.83 352.82
3 1020 1552.64 1199.75 352.89
4 1020 1552.63 1199.03 353.60
5 0 1552.64 1198.27 354.37
6 0 1552.65 1197.49 355.16
7 0 1552.66 1196.90 355.76
8 0 1552.67 1196.70 355.97
9 0 1552.69 1196.66 356.03
10 0 1552.70 1196.66 356.04
11 0 1552.71 1196.65 356.06
12 130 1552.71 1198.34 354.37
13 2240 1552.68 1200.62 352.06
14 2320 1552.64 1200.60 352.04
15 2320 1552.59 1200.59 352.00
16 2320 1552.55 1200.64 351.91
17 2320 1552.51 1200.59 351.92
18 2330 1552.48 1200.61 351.87
19 2350 1552.44 1200.64 351.80
20 2190 1552.40 1200.09 352.31
21
22
23
24
AVG 1130   1552.62 1199.02 353.59
MAX 2350   1552.71 1200.64 356.06
MIN 0   1552.40 1196.65 351.80