US Army Corps of Engineers

Bonneville Dam

Friday April 19, 2024

New Date:

HourTotal Outflow kcfsGeneration Flow kcfsSpill kcfsPH 1 Forebay ElevationTailwater ElevationAverage HeadProject Forebay ElevationStevenson Gage ElevationProject Tailwater Elevation
1 197.30 37.60147.30 75.20 16.10 59.10 74.90 75.90 16.20
2 199.20 37.90148.90 75.20 16.20 59.00 74.90 75.90 16.30
3 199.20 37.80149.00 75.20 16.20 59.00 74.90 76.00 16.30
4 199.00 37.60149.00 75.20 16.10 59.10 74.90 76.00 16.20
5 199.10 37.70149.00 75.20 16.20 59.00 74.90 76.00 16.20
6 199.30 37.90149.00 75.40 16.20 59.20 75.10 76.10 16.20
7 199.50 37.80149.30 75.80 16.30 59.50 75.60 76.50 16.30
8 199.70 37.60149.70 75.90 16.30 59.60 75.60 76.60 16.40
9 208.20 45.90149.90 75.80 17.00 58.80 75.60 76.70 17.00
10 214.10 51.80149.90 76.00 17.00 59.00 75.70 76.80 17.10
11 214.00 51.50150.10 75.60 17.00 58.60 75.40 76.50 17.00
12 213.40 51.50149.50 75.70 16.80 58.90 75.40 76.40 16.80
13 201.40 39.50149.50 75.60 16.50 59.10 75.40 76.40 16.50
14 200.40 38.60149.40 74.80 16.40 58.40 74.90 75.90 16.40
15 199.60 38.80148.40 74.50 16.40 58.10 74.40 75.50 16.40
16 199.00 38.80147.80 74.40 16.30 58.10 74.20 75.30 16.30
17 198.60 38.80147.40 74.10 16.30 57.80 73.90 75.00 16.40
18 199.40 39.10147.90 73.70 16.40 57.30 73.50 74.60 16.40
19 199.30 39.10147.80 73.50 16.40 57.10 73.50 74.40 16.40
20 198.70 38.40147.90 73.60 16.40 57.20 73.30 74.50 16.50
21 200.50 39.90148.20 73.60 16.50 57.10 73.50 74.60 16.50
22 200.50 39.90148.20 73.60 16.50 57.10 73.50 74.60 16.60
23 200.60 40.00148.20 73.70 16.50 57.20 73.30 74.60 16.40
24 199.80 39.20148.20 73.80 16.30 57.50 73.60 74.60 16.30
AVG 201.66 40.53148.73 74.80 16.43 58.37 74.58 75.64 16.46
MAX 214.10 51.80150.10 76.00 17.00 59.60 75.70 76.80 17.10
MIN 197.30 37.60147.30 73.50 16.10 57.10 73.30 74.40 16.20

  Powerhouse 1 Powerhouse 2 Project
HourGeneration Flow kcfsForebay ElevationForebay ElevationGeneration Flow kcfsSpillway Gates in UseMiscellaneous Flow kcfs*
1 0.00 75.2 74.9 37.60 18 12.4
2 0.00 75.2 74.9 37.90 18 12.4
3 0.00 75.2 74.9 37.80 18 12.4
4 0.00 75.2 74.9 37.60 18 12.4
5 0.00 75.2 74.9 37.70 18 12.4
6 0.00 75.4 75.1 37.90 18 12.4
7 0.00 75.8 75.6 37.80 18 12.4
8 0.00 75.9 75.6 37.60 18 12.4
9 0.00 75.8 75.6 45.90 18 12.4
10 0.00 76.0 75.7 51.80 18 12.4
11 0.00 75.6 75.4 51.50 18 12.4
12 0.00 75.7 75.4 51.50 18 12.4
13 0.00 75.6 75.4 39.50 18 12.4
14 0.00 74.8 74.9 38.60 18 12.4
15 0.00 74.5 74.4 38.80 18 12.4
16 0.00 74.4 74.2 38.80 18 12.4
17 0.00 74.1 73.9 38.80 18 12.4
18 0.00 73.7 73.5 39.10 18 12.4
19 0.00 73.5 73.5 39.10 18 12.4
20 0.00 73.6 73.3 38.40 18 12.4
21 0.00 73.6 73.5 39.90 18 12.4
22 0.00 73.6 73.5 39.90 18 12.4
23 0.00 73.7 73.3 40.00 18 12.4
24 0.00 73.8 73.6 39.20 18 12.4
AVG 0.00 74.8 74.6 40.53 18 12.4
MAX 0.00 76.0 75.7 51.80 18 12.4
MIN 0.00 73.5 73.3 37.60 18 12.4

* Miscellaneous Flow includes fish ladders, PH1 sluiceway, navigation lock, PH2 DSM, UMT, and PH2 corner collector (B2CC). When all routes are in operation (March-August), total Misc Flow will be ~12.4 kcfs. Flow through the B2CC is ~5 kcfs, so fluctuations of +/-5 kcfs at any time of year indicate the B2CC is open/closed.