US Army Corps of Engineers

Bonneville Dam

Friday April 26, 2024

New Date:

HourTotal Outflow kcfsGeneration Flow kcfsSpill kcfsPH 1 Forebay ElevationTailwater ElevationAverage HeadProject Forebay ElevationStevenson Gage ElevationProject Tailwater Elevation
1 168.20 33.50122.30 73.30 14.60 58.70 73.10 74.10 14.60
2 168.00 33.60122.00 73.20 14.50 58.70 73.00 74.00 14.70
3 167.70 33.40121.90 73.30 14.50 58.80 73.00 73.90 14.60
4 167.80 33.50121.90 73.20 14.50 58.70 73.00 73.90 14.50
5 167.80 33.50121.90 73.10 14.40 58.70 72.90 73.90 14.40
6 168.90 33.60122.90 73.00 14.50 58.50 72.80 73.80 14.60
7 171.40 33.60125.40 73.30 14.60 58.70 73.10 73.90 14.60
8 172.00 33.70125.90 73.50 14.70 58.80 73.30 74.20 14.90
9 172.10 33.60126.10 73.60 14.90 58.70 73.40 74.30 14.90
10 172.10 33.50126.20 73.30 15.00 58.30 73.10 74.20 15.10
11 171.50 33.40125.70 73.30 15.00 58.30 73.00 74.00 15.10
12 171.60 33.50125.70 73.30 15.10 58.20 73.10 74.00 15.10
13 171.60 33.50125.70 73.20 15.00 58.20 73.00 74.00 15.10
14 171.30 33.30125.60 73.10 15.00 58.10 73.00 73.90 15.10
15 171.50 33.60125.50 73.10 14.90 58.20 72.90 73.90 15.00
16 171.30 33.50125.40 73.00 15.10 57.90 72.80 73.80 14.90
17 171.40 33.60125.40 72.90 14.90 58.00 72.80 73.80 14.90
18 171.30 33.60125.30 72.90 14.80 58.10 72.70 73.70 15.00
19 171.10 33.50125.20 72.90 14.80 58.10 72.70 73.70 14.70
20 171.20 33.50125.30 73.10 14.80 58.30 72.90 73.80 14.80
21
22
23
24
AVG 170.49 33.52124.57 73.18 14.78 58.40 72.98 73.94 14.83
MAX 172.10 33.70126.20 73.60 15.10 58.80 73.40 74.30 15.10
MIN 167.70 33.30121.90 72.90 14.40 57.90 72.70 73.70 14.40

  Powerhouse 1 Powerhouse 2 Project
HourGeneration Flow kcfsForebay ElevationForebay ElevationGeneration Flow kcfsSpillway Gates in UseMiscellaneous Flow kcfs*
1 0.00 73.3 73.1 33.50 18 12.4
2 0.00 73.2 73.0 33.60 18 12.4
3 0.00 73.3 73.0 33.40 18 12.4
4 0.00 73.2 73.0 33.50 18 12.4
5 0.00 73.1 72.9 33.50 18 12.4
6 0.00 73.0 72.8 33.60 18 12.4
7 0.00 73.3 73.1 33.60 18 12.4
8 0.00 73.5 73.3 33.70 18 12.4
9 0.00 73.6 73.4 33.60 18 12.4
10 0.00 73.3 73.1 33.50 18 12.4
11 0.00 73.3 73.0 33.40 18 12.4
12 0.00 73.3 73.1 33.50 18 12.4
13 0.00 73.2 73.0 33.50 18 12.4
14 0.00 73.1 73.0 33.30 18 12.4
15 0.00 73.1 72.9 33.60 18 12.4
16 0.00 73.0 72.8 33.50 18 12.4
17 0.00 72.9 72.8 33.60 18 12.4
18 0.00 72.9 72.7 33.60 15 12.4
19 0.00 72.9 72.7 33.50 18 12.4
20 0.00 73.1 72.9 33.50 18 12.4
21
22
23
24
AVG 0.00 73.2 73.0 33.52 18 12.4
MAX 0.00 73.6 73.4 33.70 18 12.4
MIN 0.00 72.9 72.7 33.30 15 12.4

* Miscellaneous Flow includes fish ladders, PH1 sluiceway, navigation lock, PH2 DSM, UMT, and PH2 corner collector (B2CC). When all routes are in operation (March-August), total Misc Flow will be ~12.4 kcfs. Flow through the B2CC is ~5 kcfs, so fluctuations of +/-5 kcfs at any time of year indicate the B2CC is open/closed.