Ice Harbor Dam and Lake Sacajawea
Provisional Data Warning
Hydrologic Data:
[Hourly]
[Tailwater]
[8 Days Hourly]
[Daily]
[Prior Month]
[Query]
Water Quality Data:
[High 12-hour Avg TDG]
[% Spill]
[Total Spill]
[TDG graphs]
[TDG csv]
[Temperature String]
[Spillbays]
[Forebay]
[Tailwater]
Power:
[Monthly Power Report]
Project Description
Stream: Snake River
Location: Pasco, Washington
Type of Project: Run-of-river
Authorized Purpose: Power, Navigation
Other Uses: Fishery, Recreation, Irrigation, Water Quality
Hydrologic Data
Drainage area = 103,200 sq mi
Maximum historical peak discharge:
Unregulated = 409,000 cfs (1894)
Regulated = 295,000 cfs (1894)
Lake Elevation (NGVD29)
Maximum pool = 446.0 ft
Full pool = 440.0 ft
Minimum pool = 437.0 ft
Maximum rate of change per hour = 20,000 cfs
Powerhouse
Number of units = 6
Nameplate capacity = 603 MW
Overload capacity = 693 MW
Hydraulic capacity = 106,000 cfs
7 Day Project Status
Drag to select region -
Reset
BUILDING STRONG®
U.S. Army Corps of Engineers, Columbia Basin Water Management Division
Email:
Information Provider
|
Webmaster