Albeni Falls Dam and Pend Oreille Lake
Provisional Data Warning
Hydrologic Data:
[Hourly]
[8 Days Hourly]
[Daily]
[Prior Month]
[Query]
Water Quality Data:
[TDG csv]
Water Year Summaries:
[Forebay]
[Storage]
[Inflow]
[Outflow]
Power:
[Monthly Power Report]
Project Description
Sub-basin: Upper Columbia
Stream: Pend Oreille River
Location: Newport, Washington
Owner: Corps of Engineers, Seattle District
Type of Project: Storage
Authorized Purpose: Flood Control, Power, Navigation
Other Uses: Recreation
Hydrologic Data
Drainage area = 24,400 sq mi
Maximum historical peak discharge = 200,000 cfs (1894)
Lake Elevation at Hope (NGVD29)
Maximum pool = 2,067.5 ft (limit of flowage right-of-way)
Normal full pool = 2,062.5 ft
Minimum pool = 2,049.7 ft
Usable Storage (2,051.0 to 2,062.5) = 1,155,200 AF
Powerhouse
Number of generating units = 3
Nameplate rating = 42.0 MW
Continuous overload = 48.9 MW
Short time overload = 54.3 MW
Hydraulic capacity = 33,000 cfs
7 Day Project Status
Drag to select region -
Reset
BUILDING STRONG®
U.S. Army Corps of Engineers, Columbia Basin Water Management Division
Email:
Information Provider
|
Webmaster