2004 Fish Passage Plan (Final)

Full Document 6,128k
Section 1 Overview 42k
2 Bonneville 984k
3 The Dalles 1,000k
4 John Day 696k
5 McNary 400k
6 Ice Harbor 504k
7 Lower Monumental 192k
8 Little Goose 928k
9 Lower Granite 416k
Appendix A Special Project Operations and Studies 200k
B Juvenile Fish Transportation Plan 35k
C BPA's System Load Shaping Guidelines Regarding Turbine Operation and Best Efficiency 25k
D Plan of Action for Dissolved Gas Monitoring in 2004 392k
E Measures Related to Project Spill for Fish Passage (NMFS 2000 BiOp) 168k
F Guidelines for Dewatering and Fish Handling Plans 13k
G Protocols for Adult Fish Trapping Operations at Bonneville, Ice Harbor, and Lower Granite Dams 49k
H Turbine Dewatering Procedure for Chief Joseph Dam 22k
I List of Acronyms 17k